Kegiatan Petugas Bendungan 2026-02-18
29
Bd Kembangan
keamanan
2026-02-14 18:07:30.424478
Patroli pantauan pagi.kondisi aman
Bd Pacal
keamanan
2026-02-18 00:50:55.630888
Patroli mlm bd pacal terpantau aman, cuaca cerah
2026-02-18 10:39:25.538337
patroli malam Spillway pacal kondisi terpantau aman cuaca berawan
pemantauan
2026-02-18 13:27:24.107767
Pengukuran V-notch dihilir kanan dan kiri
Bd Gebyar
keamanan
2026-02-18 05:06:33.031188
Kondisi bd gebyar aman
2026-02-18 05:07:58.453756
Tangga inpeksi bd gebyar aman
Bd Sangiran
operasi
2026-02-18 05:37:21.515075
Cek tma elv :127.72 mdpl Vol :10419833 m³ Dbit inflow :0.414 m³/dt Dbit spillway :0.188 m³/dt
Bd Krisak
operasi
2026-02-18 06:11:48.032492
Tma pagi elevasi 113.22m volume 2.212.437m3
2026-02-18 06:12:11.472212
Ukur curah hujan 0.0 mm
2026-02-18 06:12:27.281215
Pengisian data web
2026-02-18 06:12:44.617125
Pengisian data log book
2026-02-18 12:02:50.560390
Tma siang elevasi 113.20m volume 2.203.282m3
keamanan
2026-02-18 06:22:14.229880
Kondisi spilway aman
2026-02-18 06:22:30.985958
Kondisi puncak bendungan aman
2026-02-18 06:22:52.393728
Kondisi bangunan pelengkap aman
pemantauan
2026-02-18 07:58:42.902995
Pemantauan vnotch h=12cm q=6.92lt/dt
2026-02-18 09:28:18.539321
Pemantauan spilway tubuh spilway ada bocoran di beberapa titik kondisi aman perlu perbaikan
2026-02-18 09:28:55.650364
Pemantauan puncak bendungan pengamatan kelurusan pagar pengaman puncak bendungan kondisi baik
Bd Tukul
pemantauan
2026-02-18 06:13:29.060468
Monitoring curah hujan data : 1.2 mm
2026-02-18 06:14:01.079196
Monitoring TMA pagi-siang-sore
2026-02-18 10:27:27.800977
Monitoring v-notch sesar Debit : 2.863 liter/det
2026-02-18 10:28:58.078427
Pemantauan saluran v-notch horizontal, Debit kanan : 2.531 liter/det Debit kiri : 1.828 liter/det
2026-02-18 10:31:04.790606
Monitoring 37 VW Pizometer kondisi baik namun FP 3 dan FP 6, EP 4 dan EP 14 anomali pembacaan, monitoring 9 VW Pressure Cell kondisi baik namun anomali pembacaan pada sensor pembacaan EP 6
2026-02-18 10:33:08.278518
Pembersihan v-notch horizontal drain
2026-02-18 10:34:59.936378
Pembersihan v-notch sesar
keamanan
2026-02-18 06:18:16.770034
Patroli pagi kondisi puncak bendungan aman. Mematikan lampu. Kantor aman. Cuaca pagi berawan
operasi
2026-02-18 09:09:35.539420
Pengecekan oil gate Valve D 600 pengaman hjv.
Bd Gongseng
keamanan
2026-02-18 06:21:56.720921
Patroli pagi aman, cuaca mendung
Bd Blimbing
keamanan
2026-02-18 06:40:04.586961
Patroli keamanan pagi kondisi aman
pemantauan
2026-02-18 06:40:39.296096
Pemantauan visual pagi cuaca mendung
koordinator
2026-02-18 07:34:01.783710
Absen pagi
2026-02-18 13:04:23.203278
Absen siang
operasi
2026-02-18 11:08:09.454888
Monitoring tma siang elevasi 189.43 m volume 22175 m³
2026-02-18 11:08:31.891081
Monitoring tma pagi elevasi 189.40 m volume 21854 m³
Bd Gondang2
keamanan
2026-02-18 06:43:18.631208
Pantauan pagi cuaca mendung kondisi aman
2026-02-18 07:00:55.194052
Absen turun piket
operasi
2026-02-18 06:43:46.716253
Cek tma pagi elv 515.07
2026-02-18 11:31:33.348877
Cek TMA siang El 515.07
koordinator
2026-02-18 07:49:45.697092
Absen pagi 2 piket malam Tarmin dan aris
2026-02-18 13:16:37.981403
Absen siang 2 piket malam Tarmin dan aris
pemantauan
2026-02-18 13:00:11.925163
Monitoring debit vnotch
Bd Parangjoho
operasi
2026-02-18 06:46:35.404798
Mengukur curah hujan 45.2 mm
2026-02-18 06:46:55.351295
Cek tinggi bukaan pintu intake
2026-02-18 06:55:18.660160
Pembacaan peilschall TMA pagi 196.10 mdpl Volume = 790.111 m³
2026-02-18 06:56:28.626885
Mencatat debit outflow/inflow
2026-02-18 11:31:06.146164
Pembacaan peilschall TMA siang 196.07 mdpl volume = 784.503m³
pemantauan
2026-02-18 06:52:02.189840
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 7.8 cm = 2.39 lt/dt, v-notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 2.84 lt/dt
2026-02-18 12:57:20.568348
Pemantauan visual tiang penyangga jembatan intake kondisi baik
koordinator
2026-02-18 07:04:39.840756
Absen pagi
keamanan
2026-02-18 12:40:30.638324
Patroli area kolam olak aman
2026-02-18 12:41:28.064478
Patroli area lereng hilir aman
2026-02-18 12:42:09.177258
Patroli area spillway aman
2026-02-18 12:42:57.122461
Patroli area puncak bendung aman
2026-02-18 12:43:45.560018
Patroli area intake aman
2026-02-18 12:44:34.621986
Patroli area kantor jaga aman
2026-02-18 12:45:16.318173
Patroli area kom waduk aman
Bd Songputri
keamanan
2026-02-18 06:52:05.003975
Patroli pagi sekitar puncak bendungan kondisi aman cuaca mendung
operasi
2026-02-18 07:22:54.999261
Pembacaan TMA pagi elevasi 224.06 volume 434483 m³
2026-02-18 11:31:14.588037
Pembacaan TMA siang elevasi 223.97 volume 425918 m³
pemantauan
2026-02-18 07:50:08.059262
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 13.7 cm (9.63 l/d)
Bd Gondang
operasi
2026-02-18 06:52:14.821167
Cek TMA pagi elevasi saat ini 38,20mdpl volume 20.581.048m³
pemantauan
2026-02-18 10:16:57.617705
pemantauan rembesan di saluran vnoth
koordinator
2026-02-18 11:42:45.596877
Pengawasan perbaikan pintu dan pengelasan setang
Bd Kedunguling
pemantauan
2026-02-18 06:57:12.065917
Pemantauan secara visual pada kolam olak jalur outflow. Kerusakan dinding saluran outflow bertambah dimensinya.
2026-02-18 07:00:11.542007
Pemantauan secara visual pada lereng hilir tubuh bendungan.
2026-02-18 07:01:06.540560
Pemantauan secara visual pada puncak bendungan. Retakan aspal pengeras bertambah dimensinya.
2026-02-18 07:02:03.519903
Pemantauan secara visual pada puncak bendung. Retakan aspal pengeras bertambah dimensinya.
2026-02-18 07:02:56.971217
Penginputan dan rekap data hasil kegiatan pemantauan.
Bd Kedung Brubus
operasi
2026-02-18 07:01:49.318864
Tma 109.04 m volume 702985.0m3
Bd Nawangan
operasi
2026-02-18 07:16:58.332282
Tma pagi elevasi:227,55mdpl vol:577638m3
2026-02-18 11:35:55.011242
Tma siang elevasi:227,57mdpl vol:579580m3
koordinator
2026-02-18 07:42:55.508092
Apel pagi
Bd Gembong
koordinator
2026-02-18 07:24:06.146664
Absen piket pagi
keamanan
2026-02-18 07:24:36.150971
Patroli pagi kondisi visual bendungan terpantau aman
pemantauan
2026-02-18 07:25:01.775648
Cek curah hujan : 0 mm cuaca mendung
operasi
2026-02-18 07:25:26.854571
Pembacaan Tma pagi : 119,76 m volume : 16,180 m³
Bd Brambang
operasi
2026-02-18 07:25:15.760577
cek tma pagi dan membantu op pemeliharaan
2026-02-18 12:28:44.479562
Cek tma siang
koordinator
2026-02-18 08:06:32.904997
Absen Turun Piket
2026-02-18 08:16:31.723218
Absen Pagi
pemantauan
2026-02-18 08:12:01.553180
Pantauan visual rumah intake kondisi baik
2026-02-18 08:12:47.038514
Pantauan CH 0 mm cuaca mendung
keamanan
2026-02-18 13:08:00.180359
Pantauan pagi bd sekitaran aman cuaca mendung
2026-02-18 13:08:51.041028
Pantauan siang wilayah selatan sekitar aman cuaca gerimis
Bd Pidekso
operasi
2026-02-18 07:45:21.584623
Elevasi tma pagi:183.53 Volume:22207623
2026-02-18 07:45:59.479705
Q_outflow bottom outlet:0.915 m³/detik
2026-02-18 12:59:11.009268
Elevasi tma siang:183.54 volume:22227103
pemantauan
2026-02-18 08:23:00.341538
V-nocth 1 terbaca 0.59 cm , air mengalir jernih dan lancar
2026-02-18 08:23:30.592340
V-nocth 2 terbaca 0.49 cm , air mengalir jernih dan lancar
2026-02-18 08:24:01.973917
V-nocth 3 terbaca 0.47 cm , air mengalir jernih dan lancar
2026-02-18 08:25:41.490640
MONITORING KLIMATOLOGI RABU 18.02.2026 Cuaca : MENDUNG 1. MAW : 183.53 2. CH : 2 mm 3. CH auto : - mm 4. Anemo : 1209920 5. Penguapan : 6 mm 6. Termo air : - C 7. Penyinaran : 250 menit 8. Radiasi : -W/m²l 9. Suhu max : - C 10. Kelembaban :- % 11. Termo : 32/28 C 12. Piscro. : 28/27 C **kondisi alat KLIMATOLOGI yang tidak terbaca karena sensor telemtri rusak, tidak bisa mengirim data ke server : 1.Curah hujan otomatis 2.Radiasi 3.Suhu max 4.Kelembapan 5.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk 6.Kelembapan 7.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk **KONDISI ALAT KLIMATOLOGI yang berfungsi : 1. Anemometer (baik) 2. 2. Bak penguapan (baik) 3. 3.Penyinaran (baik) 4. 4.Radiasi matahari (baik) 5. 5.Termometer (baik) 6. 6.Piscrometer(baik
keamanan
2026-02-18 09:12:41.782215
Pengecekan papan papan larangan kondisi terpantau aman
2026-02-18 09:13:01.921862
Patroli area akses masuk fasum kondisi terpantau aman
2026-02-18 09:13:19.038525
Patroli area puncak tubuh bendung kondisi terpantau aman
2026-02-18 09:13:30.417375
Patroli area lereng hulu kondisi terpantau aman
2026-02-18 09:13:43.672931
Patroli area lereng hilir kondisi terpantau aman
koordinator
2026-02-18 09:20:21.621582
Apel pagi
Bd Ngancar
operasi
2026-02-18 08:05:46.173696
Tma pagi E 247.94 MDPL volume:1.495.753 m3
koordinator
2026-02-18 08:21:25.102789
absen pagi
pemantauan
2026-02-18 09:25:05.032237
Pemantauan V-notch H:6 cm Q:1.25 L/detik
2026-02-18 09:25:41.295180
Pemantauan V-notch 2. tidak ada rembesan
Bd Lalung
keamanan
2026-02-18 08:31:22.539858
Patroli pagi.kondisi aman,cuaca berawan(petugas:nur rokhim)
operasi
2026-02-18 09:14:37.371268
cek tma pagi elevasi 150.20 m,volume 3938091 m3
pemantauan
2026-02-18 09:17:59.040849
Cek tanggul lereng hulu sisi kanan intake, kondisi baik.
Bd Botok
operasi
2026-02-18 09:30:43.321835
Pembacaan TMA pagi Peilschall 2.31 m Elevasi 277.88 Mdpl Volume 2670 m³
2026-02-18 09:31:06.517892
Pembacaan outflow intake
2026-02-18 14:04:46.040052
Pembacaan TMA siang hari
pemantauan
2026-02-18 09:34:00.365833
Pengukuran curah hujan dengan hasil 0 mm
2026-02-18 09:34:26.157914
Pengukuran rembesan,v-notch 1 peilskal 0,debit 0
2026-02-18 09:35:44.466204
Pemantauan visual bangunan intake,kondisi hidromekanikal pintu intake baru di servis
2026-02-18 09:36:21.441409
Pemantauan visual puncak bendungan kondisi kurang lampu penerangan
Bd Gonggang
pemantauan
2026-02-18 10:09:58.720720
Vnotch 2,1 cm debit 0,10 liter/detik
2026-02-18 10:10:22.680364
Pintu intake pengoperasian berat
Bd Jombor
pemantauan
2026-02-18 11:08:22.739619
pengukuran data curah hujan
2026-02-18 11:08:52.815031
pemantauan visual pada lereng hulu kondisi baik
2026-02-18 11:09:02.036112
pemantauan visual pada puncak bendungan kondisi baik, perlu adanya lapisan perkerasan dan lampu penerangan
2026-02-18 11:09:12.282961
pemantauan visual pada bangunan intake kondisi baik
Bd Mulur
keamanan
2026-02-18 11:09:21.956891
Patroli kawasan tubuh bendungan hulu rumah intake
koordinator
2026-02-18 11:15:56.347972
Absen pagi
pemantauan
2026-02-18 12:21:02.747292
pengecekan fisik area saluran suplesi perlu adanya pengerukan sedimen
2026-02-18 12:21:29.708450
pengecekan fisik area tubuh bendungan kondisi baik
2026-02-18 12:21:52.656789
pengukuran curah hujan ch :8.0
Bd Ketro
keamanan
2026-02-18 11:19:03.239909
Patroli siang pada puncak bendung
pemantauan
2026-02-18 11:24:54.974760
Pemantauan visual pada lereng hulu
Bd Cengklik
pemantauan
2026-02-18 11:24:15.260308
cek v notc
2026-02-18 11:24:58.940046
cek retakkan
Bd Saradan
pemantauan
2026-02-18 12:03:26.809264
Pemantauan visual dan pemantauan saluran outlet kondisi baik
Bd Prijetan
pemantauan
2026-02-18 12:26:35.343232
Pengamatan rembesan vnotch sebelah barat kondisi pembacaan 0cm dan pengamatan rembesan vnotch sebelah timur kondisi pembacaan 10cm namun pembacaan tidak valid karna rembesan bukan dari tubuh bendungan
2026-02-18 12:27:37.986613
Cek tma pagi
Bd Plumbon
pemantauan
2026-02-18 12:59:41.279136
Pemeriksaan visual v notch 1. Kondisi kering, plat besi V tidak ada, plesteran lantai dan dinding rusak.
2026-02-18 13:00:50.840053
Pemeriksaan visual puncak tubuh bendungan. Terdapat 2 buah lampu penerangan kondisi menyala baik.
2026-02-18 13:02:21.528832
Pemeriksaan visual puncak tubuh bendungan. Kondisi papan nomlekatur terpantau baik, kondisi lampu tidak menyala.
2026-02-18 13:05:11.380996
Pemeriksaan visual puncak tubuh bendungan. Kondisi portal masuk dan keluar sisi selatan beberapa tiang beton rusak plesteran, beberapa jeruji pagar rusak hilang. Kondisi gembok berfungsi baik.
2026-02-18 13:06:30.148724
Pemeriksaan visual lereng hulu tubuh bendungan. Kondisi papan peilschale TMA terpantau baik.
2026-02-18 13:07:55.034307
Pemeriksaan visual lereng hulu tubuh bendungan. Kondisi beton revetment sisi selatan terpantau di beberapa titik mengalami retakan kecil dan kropos.
2026-02-18 13:09:32.547420
Pemeriksaan visual lereng hulu tubuh bendungan. Kondisi susunan batu riprap sisi selatan mulai ditumbuhi rumput dan beberapa batu mengalami pelapukan.