Kegiatan Petugas Bendungan 2026-03-29
9
Bd Parangjoho
koordinator
2026-03-22 17:24:57.675014
Absen sore
2026-03-29 07:03:29.252515
Absen pagi
operasi
2026-03-29 06:46:03.242427
Mengukur curah hujan 1 mm
2026-03-29 06:52:31.318535
Mencatat debit outflow/inflow
2026-03-29 06:52:52.515284
Pembacaan peilschall TMA pagi 196.03 mdpl volume = 777.026 m³
pemantauan
2026-03-29 06:57:31.535135
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, notich no 2= 6.0 cm = 1.25 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 1.70 lt/dt
Bd Pacal
keamanan
2026-03-29 01:09:31.056356
Patroli malam sepillway pacal kondisi terpantau aman, cuaca mendung
Bd Gondang
operasi
2026-03-29 05:49:37.172819
Bd gondang elevasi 37.25 mdpl, Volume 17.006.239 m³
Bd Sangiran
operasi
2026-03-29 05:55:56.357249
Cek tma elv :127.82 mdpl Vol :10572280 m³ Ch :60.6 mm Dbit inflow :3.519 m³/dt Dbit spilway :2.764 m³/dt
Bd Gondang2
operasi
2026-03-29 05:58:54.643655
Cek TMA pagi Elv 515.10
pemantauan
2026-03-29 06:00:26.476507
Monitoring curah hujan 6.4mm
keamanan
2026-03-29 06:00:56.419549
Pantauan pagi cuaca berawan
Bd Blimbing
operasi
2026-03-29 06:01:59.258237
Monitoring tma pagi elevasi 189.30 mdpl volume 20782 m³
Bd Nawangan
operasi
2026-03-29 06:13:49.885947
Tma pagi elevasi:228,57mdpl vol:675194m3
2026-03-29 06:14:52.609575
Buka pintu intake untuk layanan irigasi mt 2 dengan debit 0.116m3/dt
Bd Gongseng
keamanan
2026-03-29 06:25:03.441370
Patroli pagi keadaan kondusif cuaca cerah
Bd Krisak
keamanan
2026-03-29 06:43:33.686910
Kantor bendungan kondisi aman
2026-03-29 06:44:05.822397
Kondisi pintu intake aman
2026-03-29 06:44:51.262974
Kondisi lereng hilir aman
operasi
2026-03-29 07:09:42.540583
Tma pagi elevasi 113.47m volume 2.326.880m3