Kegiatan Petugas Bendungan 2026-04-26
19
Bd Pacal
keamanan
2026-04-25 23:56:09.442792
patroli malam Spillway pacal kondisi terpantau aman cuaca cerah
operasi
2026-04-26 08:24:55.770307
Tma pagi 115.11 mdpl, Volume:22.827.232 m³
pemantauan
2026-04-26 08:48:04.629338
Pengukuran V-notch dihilir kanan dan kiri
Bd Sangiran
operasi
2026-04-26 05:27:07.172821
Cek tma elv :127.22 mdpl Vol :9657597 m³
Bd Tukul
keamanan
2026-04-26 05:32:31.852192
Patroli pagi kondisi bendungan aman. Mematikan lampu jalan. Cuaca cerah. Kantor aman. Dua petugas stanbay di kantor
pemantauan
2026-04-26 07:48:07.962568
Monitoring TMA pagi-siang-sore
Bd Gondang
operasi
2026-04-26 05:39:48.726446
Cek TMA pagi elevasi saat ini 37,84mdpl volume 19.181.800m³
Bd Blimbing
operasi
2026-04-26 06:09:06.448994
Pembacaan tma pagi elevasi 189.57 m volume 23684 m³
Bd Krisak
keamanan
2026-04-26 06:11:42.499869
Kondisi bangunan pelengkap aman
2026-04-26 06:12:14.821525
Kondisi kom waduk aman
2026-04-26 06:12:44.257969
Kondisi puncak bendungan aman
2026-04-26 06:13:49.313089
Kondisi lereng hilir aman
2026-04-26 06:14:15.899839
Kondisi lereng hulu aman
2026-04-26 06:14:39.770904
Kondisi pintu intake aman
2026-04-26 06:15:09.478150
Kondisi bangunan spillway aman
2026-04-26 06:16:16.274701
Kondisi spadan aman
2026-04-26 06:35:10.972834
Kondisi kantor bendungan aman
pemantauan
2026-04-26 06:42:29.881513
Pemantauan vnocth h=10cm q=4.41lt/dt
operasi
2026-04-26 06:55:06.399243
Tma pagi elevasi 112.80m volume 2.026.443m3
2026-04-26 06:55:20.429743
Ukur curah hujan 0.0 mm
2026-04-26 06:55:33.601072
Pengisian data web
2026-04-26 06:55:45.790704
Pengisian data log book
Bd Gongseng
keamanan
2026-04-26 06:14:34.725600
Patroli pagi keadaan kondusif cuaca cerah
Bd Dawuhan
keamanan
2026-04-26 06:40:18.697305
Patroli area kantor kondisi aman
Bd Nawangan
operasi
2026-04-26 06:40:37.817838
Tma pagi elevasi:228,61mdpl vol:679607m3
Bd Gondang2
operasi
2026-04-26 06:42:27.711632
Cek tma pagi elv 515.08
pemantauan
2026-04-26 06:42:58.089566
Monitoring curah hujan 1.2mm
keamanan
2026-04-26 06:43:24.345646
Patroli pagi terpantau aman cuaca cerah
2026-04-26 07:07:44.887045
Absen turun piket
Bd Brambang
koordinator
2026-04-26 06:44:00.051625
Absen turun piket
keamanan
2026-04-26 06:44:14.531303
Patroli pagi kondisi aman cuaca cerah
pemantauan
2026-04-26 06:46:59.383271
Cek curah hujan 0 mm
operasi
2026-04-26 06:47:22.812318
Cek tma pagi
Bd Parangjoho
operasi
2026-04-26 06:55:51.990016
Menghitung debit outflow/inflow
2026-04-26 06:55:57.790709
Pembacaan peilschall TMA pagi 196.02 mdpl volume = 775.157 m³
2026-04-26 06:56:36.424488
Mengukur curah hujan= 0 mm
pemantauan
2026-04-26 06:57:25.926640
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt,v-notch no 2= 6.0 cm = 1.25 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 1.75 lt/dt
Bd Prijetan
keamanan
2026-04-26 07:03:22.072998
Monitoring pembacaan TMA pagi bd Prijetan
Bd Songputri
keamanan
2026-04-26 07:16:23.164774
Patroli pagi sekitar barat rumah intake kondisi aman cuaca berawan
koordinator
2026-04-26 07:32:51.536834
Absen pagi
operasi
2026-04-26 07:36:13.747518
Pembacaan TMA pagi elevasi 224.00 volume 428773 m³
Bd Kedung Brubus
operasi
2026-04-26 07:23:18.665833
Tma 109.97 m volume 1039019.0m3
Bd Pidekso
operasi
2026-04-26 07:35:11.760570
Elevasi tma pagi:185.08 volume:25349046
2026-04-26 07:35:25.597001
Q_outflow bottom outlet:0.943 m³/detik
Bd Ngancar
operasi
2026-04-26 08:11:29.822624
TMA PAGI , ELEVASI : 248.70 mdpl , VOLUME : 1.707.522 m³
Bd Botok
operasi
2026-04-26 08:25:37.855445
Pembacaan tma pagi
Bd Lalung
pemantauan
2026-04-26 09:24:46.169178
Pemantauan tanggul di sisi barat lereng hilir. Kondisi tanggul mengalami rembesan air tanah, tidak ada penurunan dan tidak ada perubahan pada permukaan tanah. Dengan panjang 41 meter dan lebar 13 meter
keamanan
2026-04-26 09:34:54.707546
Patroli pagi.kondisi aman,cuaca cerah(petugas:nur rokhim)