Kegiatan Petugas Bendungan 2026-02-27
33
Bd Pacal
keamanan
2026-02-27 00:13:39.509366
Patroli malam sepillway pacal kondisi terpantau aman, cuaca mendung
2026-02-27 00:15:34.017068
Patroli mlm bd pacal terpantau aman, cuaca mendung
2026-02-27 09:05:50.737516
patroli pagi area Spillway pacal kondisi terpantau aman cuaca berawan
pemantauan
2026-02-27 08:29:13.956222
Pengukuran V-notch dihilir kanan dan kiri
operasi
2026-02-27 09:53:47.471786
TMA pagi : 114,95 mdpl Volume : 22.162.884 m³
2026-02-27 11:41:02.784065
TMA siang : 114,95 mdpl Volume : 22.162.884 m³
Bd Sangiran
operasi
2026-02-27 05:52:15.885224
Cek tma elv:127.74 mdpl Vol :10450322 m³ Dbit inflow :0.934 m³/dt Dbit spillway :0.532 m³/dt
pemantauan
2026-02-27 18:41:20.010791
Pemantauan saluran outlet
Bd Gondang2
keamanan
2026-02-27 06:03:35.540136
Absen turun piket malam
2026-02-27 06:04:04.330322
Pantauan pagi bd gondang cuaca berawan terpantau aman
2026-02-27 17:17:43.412551
Absen piket malam
2026-02-27 17:18:23.577996
Pantauan awal piket malam cuaca mendung terpantau aman
operasi
2026-02-27 06:40:17.792838
Cek tma pagi elv 515.13
2026-02-27 13:43:41.941074
Cek TMA siang El 515.12
2026-02-27 17:21:04.616494
Cek tma sore elv 515.11
pemantauan
2026-02-27 09:46:26.985928
Monitoring curah hujan 4.0mm
2026-02-27 09:46:58.845536
Monitoring piezometer
2026-02-27 09:47:24.534063
Monitoring debit v-notch
koordinator
2026-02-27 12:44:16.923092
Absen pagi 2 petugas jaga malam karno dan suparlan
2026-02-27 12:44:49.635941
Absen siang 2 petugas jaga malam karno dan suparlan
2026-02-27 17:21:50.624086
Absen sore 2 petugas jaga malam karno dan suparlan
Bd Kedung Brubus
operasi
2026-02-27 06:16:21.525390
Tma 109.09 m volume 718095.0m3
Bd Blimbing
keamanan
2026-02-27 06:24:28.833658
Patroli keamanan pagi kondisi aman
operasi
2026-02-27 07:28:27.976419
Monitoring tma pagi elevasi 189.39 m volume 21747 m³
2026-02-27 11:07:00.937309
Monitoring tma siang elevasi 189.40 m volume 21854 m³
2026-02-27 17:04:55.095830
Monitoring tma sore elevasi 189.40 m volume 21854 m³
koordinator
2026-02-27 07:48:02.328604
Absen pagi
2026-02-27 12:34:57.589703
Absen siang
2026-02-27 15:34:15.428223
Absen sore
Bd Brambang
operasi
2026-02-27 06:29:49.797895
cek tma pagi dan membantu op pemeliharaan
2026-02-27 19:54:05.543377
cek tma sore
2026-02-27 19:54:34.127822
Cek tma siang
keamanan
2026-02-27 07:44:11.871815
Patroli pagi area barat sekitar aman cuaca mendung
2026-02-27 18:28:28.716695
Pantauan sore wilayah barat sekitar aman cuaca mendung
koordinator
2026-02-27 16:18:55.899130
Absen Turun Piket
2026-02-27 16:19:27.901794
Absen Pagi
2026-02-27 16:19:50.582538
Absen Siang
2026-02-27 16:20:18.095875
Absen Sore
pemantauan
2026-02-27 16:23:37.373314
Pantauan CH 0 mm cuaca cerah
Bd Gondang
operasi
2026-02-27 06:33:47.930653
Cek TMA pagi elevasi saat ini 38,17mdpl volume 20.459.659m³
koordinator
2026-02-27 10:06:27.447538
Absen dan apel pagi BD gondang
pemantauan
2026-02-27 10:49:30.080560
pemantauan rembesan di saluran vnoth
Bd Parangjoho
operasi
2026-02-27 06:59:08.506658
Mengukur curah hujan 45.2 mm
2026-02-27 07:01:05.524924
Pembacaan peilschall TMA pagi 196.17 mdpl volume = 803.196 m³
2026-02-27 07:01:17.950310
Mencatat debit outflow/inflow
2026-02-27 07:01:30.898034
Mengecek bukaan pintu intake
2026-02-27 11:21:57.655627
Pembacaan peilschall TMA siang 196.10 mdpl volume = 790.111 m³
2026-02-27 17:52:46.480906
Pembacaan peilschall TMA sore 196.10 mdpl volume = 790.111 m³
pemantauan
2026-02-27 07:04:59.119312
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 7.6 cm = 2.24 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 2.69 lt/dt
2026-02-27 11:22:42.145418
Pemantauan visual daerah genangan, Tinggi muka air waduk naik dan warna air keruh
2026-02-27 11:22:59.928008
Pemantauan visual talud hulu,kondisi baik
keamanan
2026-02-27 12:35:38.237046
Patroli siang area kantor jaga terpantau aman
2026-02-27 12:35:59.271509
Patroli siang area puncak bendung terpantau aman
2026-02-27 12:36:21.760265
Patroli siang area kolam olak terpantau aman
2026-02-27 12:36:43.265378
Patroli siang area intake terpantau aman
2026-02-27 12:38:45.773520
Patroli siang area lereng hilir terpantau aman
2026-02-27 12:39:08.466566
Patroli siang area kom waduk terpantau aman
2026-02-27 12:39:28.848256
Patroli siang area spill way terpantau aman
koordinator
2026-02-27 13:06:33.234520
Absen pagi
2026-02-27 13:06:48.193358
Absen siang
Bd Gebyar
operasi
2026-02-27 06:59:27.232465
Pembacaan TMA pagi, Elevasi = 325.20mdpl, Vol = 591297m³
Bd Songputri
keamanan
2026-02-27 07:03:20.388051
Patroli pagi sekitar lereng hulu kondisi aman cuaca berawan
pemantauan
2026-02-27 07:43:27.036641
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 12.8 cm (8.13 l/d)
operasi
2026-02-27 07:43:45.332252
Buka pintu intake bawah, penurunan TMA waduk, pengendalian banjir dan buang sedimen Kom waduk
2026-02-27 07:45:33.911804
Pembacaan TMA pagi elevasi 224.08 volume 436386 m³
2026-02-27 11:00:37.559726
Pembacaan TMA siang elevasi 224.00 volume 428773 m³
2026-02-27 16:56:51.008381
Pembacaan TMA sore elevasi 223.89 volume 418305 m³
koordinator
2026-02-27 07:44:10.310521
Absen pagi
2026-02-27 15:59:20.915462
Absen siang
2026-02-27 16:00:25.768336
Absen sore
Bd Gembong
koordinator
2026-02-27 07:11:11.479112
Absen turun piket malam
2026-02-27 08:13:35.537790
Absen pagi
2026-02-27 16:15:17.735795
Absen siang
2026-02-27 16:15:41.827654
Absen sore
operasi
2026-02-27 07:11:36.562317
Pembacaan Tma pagi : 119,76 m volume : 16,180 m³
2026-02-27 17:03:59.446756
Pembacaan TMA SORE 119.87 m VOLUME 16180.0 m³
pemantauan
2026-02-27 15:18:08.141246
Mengukur curah hujan 0 mm
2026-02-27 15:18:33.575922
Monitoring kualitas air berwarna kecoklatan
keamanan
2026-02-27 15:19:07.788293
Patroli pagi kondisi aman cuaca cerah
Bd Kedunguling
pemantauan
2026-02-27 07:16:12.077895
Pemantauan secara visual pada drainase bendungan. Retakan dan kerusakan lantai dan dinding bangunan masih tetap.
2026-02-27 07:19:19.257332
Pemantauan secara visual pada intake 2. Retakan dan pengelupasan lantai masih tetap.
2026-02-27 07:21:34.810994
Pemantauan secara visual pada puncak bendungan.
2026-02-27 07:22:45.986046
Pemantauan secara visual pada puncak bendungan. Retakan aspal pengeras bertambah dimensinya.
2026-02-27 07:23:41.936546
Penginputan dan rekap data hasil kegiatan pemantauan
operasi
2026-02-27 14:56:24.294344
Pengukuran TMA Pagi TMA 165.74 Volume 321122.0
2026-02-27 14:56:58.008600
Pengukuran TMA Siang TMA 165.72 Volume 318679.0
2026-02-27 14:57:14.310371
Monitoring saluran outflow.
2026-02-27 14:57:26.647041
Input data TMA.
2026-02-27 14:57:40.396562
Pengecekan curah hujan.
2026-02-27 16:49:34.942371
Pengukuran TMA Sore TMA 165.71 Volume 317458.0
Bd Krisak
pemantauan
2026-02-27 07:16:51.199941
Pemantauan vnotch h=11cm q=5.58lt/dt
2026-02-27 07:17:22.786833
Pemantauan lereng hilir pasangan batu rip rap lereng hilir kondisi baik
2026-02-27 07:17:44.213376
Pemantauan puncak bendungan kondisi lapisan pengeras jalan puncak bendungan baik
operasi
2026-02-27 07:56:05.904079
Tma pagi elevasi 113.32m volume 2.258.214m3
2026-02-27 07:56:29.720046
Pengisian data web
2026-02-27 07:57:05.428041
Pengisian data log book
2026-02-27 07:58:22.843475
Ukur curah hujan 9.1 mm
2026-02-27 11:40:35.282423
Tma siang elevasi 113.33m volume 2.262.792m3
2026-02-27 16:14:44.190225
Tma sore elevasi 113.34m volume 2.267.370m3
keamanan
2026-02-27 12:46:56.963039
Kondisi lereng hilir aman
2026-02-27 12:47:13.889358
Kondisi puncak bendungan aman
2026-02-27 12:47:35.976415
Kondisi pintu intake aman
2026-02-27 20:29:12.587079
Piket malam terpantau aman
Bd Botok
koordinator
2026-02-27 07:18:26.162009
Absen pagi turun piket malam
keamanan
2026-02-27 09:11:28.510917
Patroli pagi kondisi aman
operasi
2026-02-27 09:21:49.591310
Pembacaan TMA pagi hari
2026-02-27 14:35:10.291045
Pembacaan outflow intake
2026-02-27 14:38:25.015484
Pembacaan TMA siang hari
2026-02-27 14:57:41.512816
Menghitung debit outflow dan inflow, merekap hasil dilog book neraca air waduk dan meneruskan laporan pada web
2026-02-27 14:58:01.135597
Pembacaan TMA sore hari
Bd Nawangan
pemantauan
2026-02-27 07:19:36.669564
Pemantauan v-nocth 1 debit 5.83 ltr/detik
2026-02-27 07:20:17.295629
Pemantauan v-nocth 2 debit 4.19 ltr/detik
2026-02-27 16:11:06.361915
Pemantauan toe drain dikaki bendungan kondisi baik
2026-02-27 16:12:11.222313
Pemantauan fishbone dilereng hilir kondisi baik,dibantu petugas keamanan kawasan
2026-02-27 16:13:30.003382
Pemantauan gebalan rumput dilereng hilir kondisi baik,dibantu petugas keamanan kawasan
koordinator
2026-02-27 07:31:34.039397
Apel pagi
operasi
2026-02-27 11:20:46.078083
Tma pagi elevasi:229,05mdpl vol:723298m3
2026-02-27 11:22:19.053263
Tma siang elevasi:229,05mdpl vol:723298m3
2026-02-27 16:58:50.812814
Tma sore ekevasi:229,06mdpl vol:725152m3
keamanan
2026-02-27 16:10:13.250568
Patroli pagi di area riprap lereng hilir bendungan kondisi aman
2026-02-27 16:11:24.367390
Patroli siang di area jalan inspeksi bendungan sebelah timur kondisi aman
2026-02-27 16:11:52.777589
Patroli sore di area bukit tumpuan kanan kondisi aman
2026-02-27 19:31:24.550557
Piket malam bd nawangan cuaca mendung,terpantau aman.petugas kiki setyawan,purwanto
Bd Pidekso
operasi
2026-02-27 07:49:16.729419
Elevasi tma pagi:185.03 Volume:25229672
2026-02-27 07:49:38.379759
Q_outflow bottom outlet:0.942 m³/detik
2026-02-27 13:19:13.946251
Elevasi tma siang:185.15 volume:25487328
2026-02-27 16:42:47.954209
Elevasi tma sore:185.18 volume:25551742
keamanan
2026-02-27 09:58:38.883196
Patroli area akses masuk fasum kondisi terpantau aman
2026-02-27 09:58:52.957118
Pengecekan papan papan larangan kondisi terpantau aman
2026-02-27 09:59:12.169193
Patroli area lereng hilir kondisi terpantau aman
2026-02-27 09:59:24.503713
Patroli area lereng hulu kondisi terpantau aman
2026-02-27 09:59:37.276998
Patroli area puncak tubuh bendung kondisi terpantau aman
pemantauan
2026-02-27 17:28:47.597645
JUMAT 27.02.2026 Lokasi : PIDEKSO Cuaca : MENDUNG 1. MAW : 185.03 2. CH : 58 mm 3. CH auto : - mm 4. Anemo : 1215085 5. Penguapan : 3 mm 6. Termo air : - C 7. Penyinaran : 35 menit 8. Radiasi : -W/m²l 9. Suhu max : - C 9.Kelembaban :- % 10. Termo : 28/28 C 11. Piscro. : 26/25 C kondisi alat KLIMATOLOGI yang tidak terbaca dikarenakan alat AWR ada kerusakan : *Curah hujan otomatis *Radiasi *Suhu max *Kelembapan *Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk
koordinator
2026-02-27 20:28:08.072291
Absen pagi
Bd Gonggang
koordinator
2026-02-27 07:50:07.587212
Memantau cuaca pagi mendung, kondisi puncak bendungan, bukit tumpuan, TMA Waduk, lereng hulu hilir, area grendbeld dan waduk ( Inflow waduk ), bangunan pengeluaran, peralatan BDSF dan spilway aman kondusif.
pemantauan
2026-02-27 10:03:13.304322
Vnotch 2,5 cm debit 0,15 liter/detik
2026-02-27 10:03:42.118508
Grendbelt sebagian lahan di manfaatkan warga, ponton rusak, sedimen tiap tahun bertambah
keamanan
2026-02-27 18:45:58.727883
*LAPORAN PIKET* Bendungan Gonggang Pukul : 18.25 WIB *1. Data Bendungan dan Waduk* Cuaca : Mendung Curah hujan saat ini : 7.8 mm El. MA terkini : 810.13 m Volume terkini : 1956374.0 m3 *2. Kondisi Spilway* Saat ini kondisi Spillway *mengalami* limpasan Ketinggian Limpasan : 13.0 cm Debit Limpasan : 0.506 m3/dt *3. Kondisi visual bendungan : Aman * *4. Nama petugas piket* - A. Ariyanto, Shihabudin
Bd Lalung
operasi
2026-02-27 08:25:29.399781
cek tma pagi elevasi 150.20 m,volume 324807 m3
2026-02-27 17:06:24.471099
cek tma siang elevasi 150.20 m,volume 324807 m3
2026-02-27 17:07:46.578946
cek tma sore elevasi 150.20 m,volume 324807 m3
pemantauan
2026-02-27 09:07:28.560172
Cek saluran outflow, kondisi baik.
keamanan
2026-02-27 09:13:43.150803
Patroli pagi.kondisi aman,cuaca saat ini cerah(petugas:nur rokhim)
2026-02-27 16:32:08.737372
Patroli sore.kondisi aman,cuaca berawan
Bd Ngancar
operasi
2026-02-27 08:25:33.953618
Tma pagi E 248.75 MDPL volume:1.721.819m3
2026-02-27 11:09:42.878791
TMA SIANG , ELEVASI : 248.80 mdpl , VOLUME : 1.736.116 m³
2026-02-27 19:28:28.832065
TMA SORE , ELEVASI : 248.80 mdpl , VOLUME : 1.736.116 m³
koordinator
2026-02-27 08:29:39.198566
Absen pagi.
keamanan
2026-02-27 11:11:31.787132
Patroli area spill way terpantau aman
2026-02-27 19:48:58.947985
Piket malam kondisi terpantau aman cuaca mendung
pemantauan
2026-02-27 11:44:25.706289
Pemantauan V-notch H:8 cm Q:2.54 L/detik
2026-02-27 11:44:57.134962
Bangunan pengeluaran (gorong gorong dalam kondisi normal)
2026-02-27 11:45:19.854661
Pemantauan V-notch 2. tidak ada rembesan
Bd Mulur
pemantauan
2026-02-27 09:01:36.221045
pengukuran curah hujan 1.0 mm
2026-02-27 09:04:05.681739
pengecekan rumah intake 1 terdapat pengelupasan atap cor perlu perbaikan
keamanan
2026-02-27 09:04:53.554569
Patroli kawasan bendungan pisometer kondisi aman
2026-02-27 09:06:01.671067
Patroli keamanan kawasan tubuh bendungan puncak
koordinator
2026-02-27 09:18:09.000744
absen pagi
Bd Pondok
pemantauan
2026-02-27 10:52:15.733503
Pemeriksaan v-notch kondisi ada keropos pada plat v.
2026-02-27 10:52:42.048793
Pemeriksaan TMA
Bd Jombor
keamanan
2026-02-27 10:52:52.344268
Patroli area bangunan intake, atap intake mengalami kebocoran, cuaca pagi ini mendung
2026-02-27 20:24:21.635339
*LAPORAN PIKET* Bendungan Jombor Pukul : 20.23 WIB *1. Data Bendungan dan Waduk* Cuaca : Berawan Curah hujan saat ini : 0.0 mm El. MA terkini : 119.1 m Volume terkini : 3450109.0 m3 *2. Kondisi Spilway* Saat ini kondisi Spillway *mengalami* limpasan Ketinggian Limpasan : 1.0 cm Debit Limpasan : 3281788.0 m3/dt *3. Kondisi visual bendungan : Aman* *4. Nama petugas piket* - Setyo Wahyudi
Bd Gongseng
keamanan
2026-02-27 11:07:25.479531
Patroli siang keadaan aman cuaca berawan
2026-02-27 14:45:28.789439
Patroli sore keadaan kondusif cuaca berawan
Bd Ketro
keamanan
2026-02-27 11:22:43.403089
Patroli siang pada patok geser cuaca cerah
Bd Tukul
pemantauan
2026-02-27 11:41:39.764957
Monitoring TMA pagi-siang-sore
2026-02-27 11:42:23.972595
Monitoring curah hujan data : 66.2 mm
2026-02-27 11:44:22.592532
Pemantauan v-notch horizontal, Debit kanan : 2.661 liter/det Debit kiri : 1.894 liter/det
2026-02-27 11:45:38.735091
Monitoring v-notch sesar Debit : 4.506 liter/det
2026-02-27 18:12:36.937777
Pembersihan kantor
2026-02-27 18:13:37.305631
Mebantu pemeliharaan membersihkan sampah
keamanan
2026-02-27 13:47:49.388794
Patroli siang lokasi kantor kondisi visual aman cuaca gerimis
2026-02-27 15:56:35.027322
Membantu petugas pemeliharaan mengambil sampah di genangan main dam
2026-02-27 19:23:46.669452
Absen sore menyalakan lampu jalan dan kantor dan laporan piket lokasi area' kantor kondisi visual aman cuaca mendung
operasi
2026-02-27 19:20:29.364892
Membantu petugas pemeliharaan pembersihan halaman dan kantor pengelola.
2026-02-27 19:21:17.643964
Membantu petugas pemeliharaan pembersihan sampah di genangan.
2026-02-27 19:22:30.018023
Lanjut piket malam bendungan tukul.
Bd Saradan
pemantauan
2026-02-27 11:54:19.401880
Pemantauan visual dan pemantauan bukit tumpuaan
Bd Cengklik
pemantauan
2026-02-27 12:27:09.371886
cek v notc
2026-02-27 12:27:51.642124
cek batu rip rap
Bd Delingan
operasi
2026-02-27 14:18:39.216166
Pengukuran Tma: 204.92 mdpl Volume: 3275672 m³ dengan curah hujan: 7 mm keadaan visual: kondusif aman cuaca cerah berawan
pemantauan
2026-02-27 14:19:35.703564
Pembacaan vnotch kiri H: 9.0 cm Q: 3.41 l/dt Kanan H: 8.0 cm Q: 2.55 l/dt kualitas air: jernih
2026-02-27 14:20:13.131335
Inspeksi visual pada spillway. Kondisi item seperti jembatan, hand rail, alat elektronik, hoist crane baik tidak ada perubahan yang signifikan cuaca cerah
Bd Plumbon
pemantauan
2026-02-27 14:24:26.298720
Pemeriksaan visual v notch 2. Kondisi ada sisa genangan air hujan dan bocoran saluran irigasi di sampingnya. Peilschale tidak ada. Plesteran sisi bawah rusak.
2026-02-27 14:26:26.938969
Pemeriksaan visual bangunan spillway. Kondisi beton mercu spillway ada keretakkan panjang 1m. Peilschale limpasan kurang besar angkanya.
2026-02-27 14:28:22.871463
Pemeriksaan visual bangunan spillway. Kondisi beton lantai hulu ada sedimen dan mulai ditumbuhi rumput dan semak.
2026-02-27 14:29:51.265584
Pemeriksaan visual bangunan spillway. Kondisi beton lantai saluran peluncur terpantau mengalami retakan kecil di beberapa titik.
2026-02-27 14:32:32.380649
Pemeriksaan visual bangunan spillway. Kondisi bangunan kolam olak peredam energi terdapat pasangan sayap batu muka dan ada sedimen.
2026-02-27 14:34:25.590014
Pemeriksaan visual bangunan spillway. Kondisi dinding sayap pasangan batu muka di beberapa titik mengalami retakan di beberapa titik.
koordinator
2026-02-27 19:40:02.912248
Foto absen pagi
2026-02-27 19:40:43.612089
Foto absen siang, 1 personil arico ijin jemput sekolah
2026-02-27 19:41:06.939747
Foto absen sore. 2 personil jatah piket malam
Bd Bendo
koordinator
2026-02-27 15:57:14.055760
Pengisian bbm genset dan monitoring perawatan genset bendungan
keamanan
2026-02-27 15:57:35.878754
Pembersihan sampah area kantor upb
pemantauan
2026-02-27 15:57:48.631074
Pembersihan sampah area kantor upb
operasi
2026-02-27 15:58:28.468503
Pengisian bbm genset dan perawaran mesin
Bd Prijetan
operasi
2026-02-27 18:38:44.165590
Pembacaan tma:49.03 mdpl volume:9.450.050m³.
Bd Notopuro
pemantauan
2026-02-27 19:05:18.251333
Lereng hulu p13 kondisi ada beberapa titik kancing nat yg hilang
2026-02-27 19:06:32.916483
Kondisi viskal di dalam rumah intake mulai ukuran dari 4 meter ke bawah angkanya sudah tidak jelas
Bd Kembangan
koordinator
2026-02-27 20:34:35.408491
Absen pagi..Kiki pkt
2026-02-27 20:35:00.263368
Absen pagi susulan
2026-02-27 20:35:31.765403
Absen siang..Kiki piket
2026-02-27 20:35:53.829420
Absen sore..Kiki piket
keamanan
2026-02-27 20:36:19.203498
Patroli pantauan pagi.kondisi aman
2026-02-27 20:36:38.646417
Patroli pantauan sore.kondisi aman