    Kegiatan Petugas Bendungan 2026-04-27

    7

Bd Plumbon


 
operasi
2026-04-21 09:44:14.438423
Pembacaan TMA pagi. El 203,90 mdpl. Vol 313.080 m3

Bd Pacal


 
keamanan
2026-04-27 00:06:03.788267
patroli malam Spillway pacal kondisi terpantau aman cuaca mendung

Bd Sangiran


 
operasi
2026-04-27 05:42:41.683079
Cek tma elv :127.21 mdpl Vol :9642352 m³ Ch :2.6 mm

Bd Gondang2


 
keamanan
2026-04-27 05:54:11.878804
Absen turun piket malam
2026-04-27 05:54:58.373753
Pantauan pagi bd gondang cuaca cerah terpantau aman

Bd Prijetan


 
koordinator
2026-04-27 05:59:28.058796
Monitoring Pembacaan TMA Pagi hari Bendungan Prijetan
 
operasi
2026-04-27 06:04:51.103947
Pembacaan tma:48.39 mdpl volume:8.162.413m³.

Bd Gembong


 
koordinator
2026-04-27 06:00:53.200605
Absen Turun Piket
 
keamanan
2026-04-27 06:02:10.485208
Patroli pagi bendungan aman cuaca berawan
 
pemantauan
2026-04-27 06:03:13.353444
Pantauan kondisi sal.sup baik
2026-04-27 06:03:50.818080
Pengukuran CH 17.8 mm Cuaca Berawan
 
operasi
2026-04-27 06:06:27.272309
Pembacaan TMA Pagi : 119,68 m Volume : 15,684 m³

Bd Gondang


 
operasi
2026-04-27 06:10:28.959814
Cek TMA pagi elevasi saat ini 37,76mdpl volume 18.886.809m³