UNIT PENGELOLA BENDUNGAN

    Kegiatan Petugas Bendungan 2026-03-15

    25

Bd Pacal


 
keamanan
2026-03-15 03:49:19.204330
patroli malam area Spillway pacal kondisi terpantau aman cuaca mendung
2026-03-15 20:28:45.581373
piket malam Spillway pacal kondisi terpantau aman cuaca mendung
 
operasi
2026-03-15 16:51:51.482395
TMA siang 115.13 mdpl, volume:22.912.830 m³

Bd Sangiran


 
operasi
2026-03-15 05:47:09.331993
Cek tma elv :127.70 mdpl Vol :10389343 m³

Bd Gembong


 
koordinator
2026-03-15 05:47:22.141129
Absen turun piket malam
 
keamanan
2026-03-15 05:47:58.188023
Patroli pagi kondisi aman cuaca cerah
 
pemantauan
2026-03-15 05:48:26.415963
Mengukur curah hujan 0 mm
 
operasi
2026-03-15 05:49:32.710904
Pembacaan Tma pagi: 119,70 m volume : 15.870 m³

Bd Brambang


 
operasi
2026-03-15 05:52:25.848061
cek tma dan pelayanan air
2026-03-15 05:52:47.679455
pelayanan air areal guworejo
2026-03-15 05:53:59.497870
pelayanan air guworejo D:0.464m³/dtk V:16.740m³ selama 10jam
2026-03-15 15:34:21.802288
Cek tma siang
2026-03-15 15:34:40.780192
cek tma sore
 
keamanan
2026-03-15 09:56:57.104317
Pantauan pagi kondisi bd aman cuaca cerah
2026-03-15 14:09:43.275444
Pantauan siang kawasan bd aman cuaca cerah

Bd Krisak


 
pemantauan
2026-03-15 06:10:01.226879
Pemantauan vnotch h=10cm q=4.41lt/dt
2026-03-15 06:10:22.434394
Pemantauan gorong gorong kondisi bangunan baik
2026-03-15 06:10:53.769907
Pemantauan puncak bendungan pengamatan kelurusan pagar pengaman puncak bendungan kondisi baik
 
operasi
2026-03-15 06:25:24.879280
Tma pagi elevasi 113.15m volume 2.180.393m3
2026-03-15 06:26:09.765079
Ukur curah hujan 0.0 mm
2026-03-15 06:27:19.390982
Pengisian data web
2026-03-15 06:27:33.934171
Pengisian data log book
2026-03-15 11:20:48.354016
Tma siang elevasi 113.14m volume 2.175.815m3
2026-03-15 16:33:21.886152
Tma sore elevasi 113.15m volume 2.180.393m3
 
keamanan
2026-03-15 08:29:31.966377
Kondisi sepadan bendungan aman
2026-03-15 08:29:49.279078
Kondisi puncak bendungan aman
2026-03-15 08:30:07.693449
Kondisi pintu intake aman
2026-03-15 19:30:27.864976
Piket malam terpantau aman

Bd Blimbing


 
operasi
2026-03-15 06:10:40.729387
Monitoring tma pagi elevasi 189.34 m volume 21211 m³
2026-03-15 12:19:00.213103
Monitoring tma siang elevasi 189.34 m volume 21211 m³
2026-03-15 17:07:22.731271
Monitoring tma sore elevasi 189.34 m volume 21211 m³
 
keamanan
2026-03-15 17:16:32.906241
Patroli keamanan pagi kondisi aman
2026-03-15 21:06:37.495988
Patroli keamanan sore kondisi aman

Bd Gondang2


 
keamanan
2026-03-15 06:21:07.120340
Pantauan pagi cuaca cerah kondisi aman
2026-03-15 06:31:05.328956
Absen turun piket
2026-03-15 12:26:16.715699
Pantauan siang cuaca cerah kondisi aman
2026-03-15 17:06:06.346008
Absen piket malam
2026-03-15 17:08:06.347299
Pantauan awal piket malam cuaca mendung terpantau aman
 
operasi
2026-03-15 06:21:30.119342
Cek tma pagi elv 515.08
2026-03-15 12:25:50.563166
Cek tma siang elv 515.08
2026-03-15 21:40:56.628845
Cek tma sore elv 515.08

Bd Gondang


 
operasi
2026-03-15 06:24:12.688016
Cek TMA pagi elevasi saat ini 38,00mdpl volume 19.771.783m³

Bd Nawangan


 
operasi
2026-03-15 06:29:37.569257
Tma pagi elevasi:229,00mdpl vol:714029m3
2026-03-15 11:47:05.778484
Tma siang elevasi:229,00mdpl vol:714029m3
2026-03-15 17:20:26.224876
Tma sore elevasi:229,00mdpl vol:714029m3
 
pemantauan
2026-03-15 15:58:03.407449
Pemantauan v-nocth 2 debit 0.47 tr/detik
2026-03-15 15:58:41.303705
Pemantauan v-nocth 1 debit 2.10 ltr/detik
 
keamanan
2026-03-15 19:26:06.187516
Piket mlm bd nawangan terpantau aman,cuaca berawan.petugas kiki setyawan,purwanto

Bd Bendo


 
operasi
2026-03-15 06:34:36.832696
Potong Rumput Area Gazebo dan Gardu Pandang

Bd Songputri


 
operasi
2026-03-15 06:48:47.995014
Pembacaan TMA pagi elevasi 224.00 volume 428773 m³
2026-03-15 14:46:40.111820
Pembacaan TMA siang elevasi 224.00 volume 428773 m³
2026-03-15 16:30:29.281798
Pembacaan TMA sore elevasi 224.00 volume 428773 m³
 
koordinator
2026-03-15 07:25:11.921651
Absen pagi
2026-03-15 12:51:21.209333
Absen siang
 
keamanan
2026-03-15 07:26:18.330762
Patroli pagi sekitar pos jaga kondisi aman cuaca cerah
2026-03-15 12:52:37.404709
Patroli siang sekitar jalan akses barat pos jaga kondisi aman cuaca cerah
2026-03-15 21:21:05.564446
Patroli mlm sekitar pos jaga kondisi aman cuaca gerimis
2026-03-15 21:21:37.246529
Piket mlm kondisi aman cuaca gerimis
 
pemantauan
2026-03-15 21:13:34.335955
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 10.2 cm (4.63 l/d)

Bd Gongseng


 
keamanan
2026-03-15 06:51:37.837155
Patroli pagi keadaan kondusif cuaca cerah
2026-03-15 11:16:24.436691
Patroli siang keadaan aman cuaca berawan
2026-03-15 14:21:16.909479
Patroli sore keadaan kondusif cuaca turun hujan

Bd Parangjoho


 
operasi
2026-03-15 06:52:37.294996
Mengukur curah hujan= 0 mm
2026-03-15 06:53:21.750164
Pembacaan peilschall TMA pagi 196.03 mdpl volume = 777.026 m³
2026-03-15 07:02:52.428687
Mencatat debit outflow/inflow
2026-03-15 13:30:20.625634
Pembacaan peilschall TMA siang 196.03 mdpl volume = 777.026 m³
2026-03-15 17:13:29.632726
Pembacaan peilschall TMA sore 196.03 mdpl volume = 777.026 m³
 
pemantauan
2026-03-15 06:54:02.570829
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 6.9 cm = 1.77 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 2.22 lt/dt
 
keamanan
2026-03-15 13:30:57.956355
Patroli area intake aman
2026-03-15 13:32:16.340485
Patroli area hilir bendungan aman
2026-03-15 13:32:38.965938
Patroli area kolam olak aman
2026-03-15 13:33:04.146861
Patroli area kom waduk aman
2026-03-15 13:33:49.667412
Patroli area puncak bendung aman
2026-03-15 13:34:27.389484
Patroli area spillway aman
2026-03-15 20:49:07.403670
Patroli piket malam terpantau aman
 
koordinator
2026-03-15 13:31:14.599362
Absen siang
2026-03-15 17:15:13.115006
Absen sore
2026-03-15 19:15:32.365899
Absen pagi
2026-03-15 20:47:33.037487
Absen piket malam

Bd Botok


 
pemantauan
2026-03-15 06:58:37.596753
Pengukuran rembesan,v-notch 1 peilskal 0,debit 0
2026-03-15 06:59:17.717030
Pengukuran curah hujan dengan hasil 0 mm
 
operasi
2026-03-15 07:00:13.782244
Pembacaan outflow intake
2026-03-15 07:01:00.489571
Pembacaan tma pagi
2026-03-15 17:03:30.023330
Pembacaan TMA sore hari
2026-03-15 20:49:57.191799
Pembacaan TMA siang hari
2026-03-15 20:51:28.607408
Menghitung debit outflow dan inflow, merekap hasil dilog book neraca air waduk dan meneruskan laporan pada web
 
keamanan
2026-03-15 07:05:30.531111
Patroli pagi kondisi aman

Bd Pidekso


 
operasi
2026-03-15 07:35:20.129830
Elevasi tma pagi:185.05 volume:25267363
2026-03-15 07:35:51.949168
Q_outflow bottom outlet:0.943 m³/detik
2026-03-15 14:00:34.162448
Elevasi tma siang:185.04 volume:25246942
2026-03-15 17:40:41.205930
Elevasi tma sore:185.09 volume:25349046

Bd Lalung


 
operasi
2026-03-15 07:54:37.215364
Cek TMA pagi elevasi 150.00m volume 3200683m3
2026-03-15 18:12:17.748971
Cek tma siang elevasi 150.00 m volume 3200683m3
2026-03-15 18:14:11.999462
Cek tma sore elevasi 150.00m volume 3200683m3
 
keamanan
2026-03-15 17:06:24.248052
Kondisi aman,cuaca gerimis(petugas:nur rokhim)

Bd Tukul


 
pemantauan
2026-03-15 08:01:30.803920
Monitoring curah hujan data : 4.5 mm
2026-03-15 08:01:47.636762
Monitoring TMA pagi-siang-sore
 
keamanan
2026-03-15 19:34:06.502931
Absen sore menyalakan lampu jalan dan kantor..laporan piket lokasi area' kantor kondisi visual aman

Bd Ngancar


 
operasi
2026-03-15 08:18:35.861871
TMA PAGI , ELEVASI : 248.70 mdpl , VOLUME : 1.707.522 m³
2026-03-15 14:25:34.159643
TMA SIANG , ELEVASI : 248.70 mdpl , VOLUME : 1.707.522 m³
2026-03-15 18:43:17.652011
TMA SORE , ELEVASI : 248.70 mdpl , VOLUME : 1.707.522 m³
 
koordinator
2026-03-15 10:27:17.249921
Absen agi
2026-03-15 18:08:15.700752
Absen sore
 
keamanan
2026-03-15 18:08:59.814762
Patroli area nomen klatur terpantau aman
2026-03-15 18:09:55.703365
Patroli area spill way dan bukit tumpuan kiri bendungan kondisi aman
2026-03-15 19:34:38.955984
piket malam kondisi terpantau aman, cuaca cerah

Bd Ketro


 
keamanan
2026-03-15 11:19:39.466936
Patroli siang pada bangunan intake
2026-03-15 20:03:53.179213
Patroli malam pada puncak bendung

Bd Prijetan


 
keamanan
2026-03-15 13:26:54.211404
Pengamanan kawasan disekitar area genangan waduk kondisi terpantau aman
2026-03-15 13:28:51.012121
Pengamanan kawasan dipuncak Bendungan kondisi terpantau aman

Bd Delingan


 
pemantauan
2026-03-15 16:47:04.131712
Pembacaan vnotch Kiri H: 8.0 cm Q: 2.55 l/dt Kanan H: 7.0 cm Q: 1.83 l/dt kualitas air jernih. Petugas: Agung w dan Pujianto
 
operasi
2026-03-15 16:49:29.818776
Pengukuran Tma: 204.72 mdpl volume: 3147361 m³ Curah hujan: 0 mm Cuaca: cerah Visual: pintu intake dan menara kondusif aman
 
keamanan
2026-03-15 16:50:04.758955
Patroli sore kawasan sekitar bendungan tidak terlalu ramai aktifitas pengunjung, selalu diamati dan pantau

Bd Pondok


 
operasi
2026-03-15 17:41:26.224268
Buka pintu baterflay Valve 2 untuk kebutuhan garap lahan tanaman padi MT II 2026n masa

Bd Kedunguling


 
operasi
2026-03-15 18:01:28.216759
Pengukuran TMA Sore TMA 165.45 Volume 285698.0
2026-03-15 18:04:42.165656
Pengukuran TMA Siang TMA 165.45 Volume 285698.0
2026-03-15 18:06:51.982105
Pengukuran TMA Pagi TMA 165.45 Volume 285698.0

Bd Gonggang


 
keamanan
2026-03-15 20:45:16.142960
*LAPORAN PIKET* Bendungan Gonggang Pukul : 20.44 WIB *1. Data Bendungan dan Waduk* Cuaca : Gerimis Curah hujan saat ini : 46.0 mm El. MA terkini : 810.07 m Volume terkini : 1949601.0 m3 *2. Kondisi Spilway* Saat ini kondisi Spillway *mengalami* limpasan Ketinggian Limpasan : 7.0 cm Debit Limpasan : 0.2 m3/dt *3. Kondisi visual bendungan : Aman* *4. Nama petugas piket* - A. Ariyanto, Shihabudin

Bd Mulur


 
keamanan
2026-03-15 22:12:42.451961
Patroli keamanan area rumah intaxe
2026-03-15 22:13:13.123441
Piket malam kondisi aman