UNIT PENGELOLA BENDUNGAN

    Kegiatan Petugas Bendungan 2026-03-03

    30

Bd Gebyar


 
operasi
2026-02-25 08:22:13.756714
Pembacaan TMA Sore, Elevasi = 325.20mdpl, Vol = 591297m³
2026-03-03 19:48:23.770016
Pembacaan TMA Pagi, Elevasi = 325.20mdpl, Vol = 591297m³
 
keamanan
2026-03-03 07:48:21.276729
Kondisi bd gebyar aman
2026-03-03 07:48:45.436792
Spilway bd gebyar aman
 
koordinator
2026-03-03 08:16:03.743431
Absen pagi

Bd Sangiran


 
operasi
2026-03-03 05:43:15.860788
Cek tma elv :127.72 mdpl Vol :10419833 m³ Ch :15.5 mm Dbit inflow :0.238 m³/dt Dbit spillway :0.188 m³/dt

Bd Blimbing


 
keamanan
2026-03-03 06:08:27.879329
Patroli keamanan pagi kondisi aman
2026-03-03 15:06:02.045363
Patroli keamanan sore kondisi aman
 
operasi
2026-03-03 06:15:59.610105
Monitoring tma pagi elevasi 189.31 m volume 20889 m³
2026-03-03 11:14:32.944134
Monitoring tma siang elevasi 189.32 m volume 20996 m³
2026-03-03 17:04:27.988025
Monitoring tma sore elevasi 189.32 mdpl volume 20996 m³
 
pemantauan
2026-03-03 06:17:45.661498
Penakaran curah hujan 10 mm
2026-03-03 07:46:32.089117
Pemantauan visual pagi cuaca mendung
2026-03-03 08:06:39.206747
Inpeksi visual lereng hulu utara
 
koordinator
2026-03-03 07:39:54.272622
Absen pagi
2026-03-03 12:36:15.321489
Absen siang
2026-03-03 15:03:15.709318
Absen sore

Bd Brambang


 
keamanan
2026-03-03 06:18:54.558964
Patroli pagi kawasan bd aman cuaca mendung
2026-03-03 18:30:08.013446
Patroli siang bd sekitar aman cuaca mendung
2026-03-03 18:30:54.352471
Patroli sore aemreq Utara sekitar aman cuaca mendung
 
koordinator
2026-03-03 08:13:16.968156
Absen Turun Piket
2026-03-03 08:13:48.170345
Absen Pagi
 
pemantauan
2026-03-03 08:14:39.176729
Pengukuran CH 4.2 mm Cuaca Berawan
2026-03-03 08:15:45.153584
Pantauan kondisi lereng hilir aman
 
operasi
2026-03-03 09:18:52.163476
cek tma pagi dan membantu op pemeliharaan
2026-03-03 18:44:43.346531
Cek tma siang
2026-03-03 18:47:30.683924
cek tma sore

Bd Gembong


 
koordinator
2026-03-03 06:21:45.244059
Absen turun piket
2026-03-03 15:24:18.685103
Absen pagi
2026-03-03 16:21:49.958404
Absen siang
2026-03-03 16:22:08.220605
Absen sore
2026-03-03 16:22:46.025575
Brifing hari Selasa
2026-03-03 16:23:12.735860
Pengisian loogbok harian
2026-03-03 16:40:13.873902
Absen piket malam
 
keamanan
2026-03-03 06:22:25.956161
Patrolli pagi hari terpabtau aman
 
pemantauan
2026-03-03 06:25:03.112393
Mengukur ch pagi 15.8 mm
 
operasi
2026-03-03 06:26:33.177829
Pembacaan TMA pagi 119.76 m VOLUME 16180.0 m³
2026-03-03 15:25:41.163726
Pembacaan TMA siang 119.76 m VOLUME 16180.0 m³
2026-03-03 16:41:13.017959
Pembacaan TMA sore 119.76 m VOLUME 16180.0 m

Bd Tukul


 
keamanan
2026-03-03 06:23:49.161728
Patroli pagi lokasi puncak bendungan kondisi visual aman cuaca mendung
2026-03-03 20:04:22.345758
Absen sore. Menyalakan lampu jalan dan kantor. Laporan piket petugas. Patroli kawasan bendungan kondisi aman. Cuaca gerimis
 
operasi
2026-03-03 08:57:51.283378
Mengisi resevoir.
2026-03-03 08:59:35.297806
Menambah bukaan HJV dari 50% ke 75% untuk mengurangi debit MAW saat.musim hujan
2026-03-03 10:37:01.590505
Pengecekan gate Valve resevoir yang menuju kantor dan SMP.
2026-03-03 15:17:57.493098
Pengecekan sleding gate.
2026-03-03 15:18:58.143914
Pengeceakan dan pembersihan seluruh kondisi peralatan hme kubikel pln panel kontrol bangunan pelengkap hois dram sleding gate stop klok tesrek dan vasilitas lainnya di dalam rumah intake.
 
pemantauan
2026-03-03 09:27:20.158363
Pemantauan v-notch horizontal, Debit kanan : 2.611 liter/det Debit kiri : 1.894 liter/det
2026-03-03 09:28:21.698379
Monitoring v-notch sesar Debit : 3.894 liter/det
2026-03-03 09:29:21.327518
Monitoring TMA pagi-siang-sore
2026-03-03 09:30:21.504474
Monitoring curah hujan data : 27.6 mm
2026-03-03 15:34:59.656055
Monitoring 37 VW Pizometer kondisi baik namun FP 3 dan FP 6, EP 4 dan EP 14 bacaan anomali, monitoring 9 VW Pressure Cell kondisi baik namun pembacaan anomali pada bacaan sensor EP 6
2026-03-03 15:40:38.428999
Membantu pemeliharaan potong rumput area v- notch

Bd Kembangan


 
pemantauan
2026-03-03 06:31:41.570421
Monitoring debit v-notch
2026-03-03 06:33:08.395119
Pantauan visual area bendungan kondisi aman,cuaca berawan
 
koordinator
2026-03-03 18:44:24.632139
Absen piket sore
 
keamanan
2026-03-03 18:45:39.295497
Patroli sore kondisi aman cuaca mendung

Bd Gondang


 
operasi
2026-03-03 06:36:57.939776
Cek TMA pagi elevasi saat ini 38,14mdpl volume 20.338.269m³
 
koordinator
2026-03-03 09:10:45.174929
Absen dan apel pagi BD gondang
 
pemantauan
2026-03-03 11:29:37.501213
pemantauan rembesan di saluran vnoth

Bd Gongseng


 
keamanan
2026-03-03 06:39:00.889044
Patroli pagi keadaan kondusif cuaca mendung
2026-03-03 11:14:56.046078
Patroli siang keadaan aman cuaca mendung
2026-03-03 14:34:42.671613
Patroli sore keadaan kondusif cuaca mendung

Bd Krisak


 
operasi
2026-03-03 06:46:17.707602
Tma pagi elevasi 113.38m volume 2.285.681m3
2026-03-03 06:46:40.363644
Ukur curah hujan 8.8 mm
2026-03-03 16:48:00.373057
Tma sore elevasi 113.32m volume 2.258.214m3
2026-03-03 16:48:54.835157
Tma siang elevasi 113.38m volume 2.285.681m3
2026-03-03 16:49:14.837159
Pengisian data web
2026-03-03 16:49:28.208955
Pengisian data log book
 
pemantauan
2026-03-03 06:49:33.105879
Pemantauan vnotch h=14cm q=10.16lt/dt
2026-03-03 06:49:54.783354
Pemantauan puncak bendungan kondisi lapisan pengeras jalan puncak bendungan baik
2026-03-03 06:50:16.573202
Pemantauan lereng hulu pasangan batu rip rap lereng hulu kondisi baik
 
koordinator
2026-03-03 07:43:30.972092
Absen pagi
 
keamanan
2026-03-03 09:09:53.524828
Kondisi pintu intake aman
2026-03-03 09:10:19.077078
Kondisi puncak bendungan aman
2026-03-03 09:10:51.051993
Kondisi lereng hulu aman

Bd Gondang2


 
keamanan
2026-03-03 06:47:34.512977
Pantauan pagi cuaca berawan
2026-03-03 06:48:44.019723
Absen turun piket malam
2026-03-03 17:01:28.907588
Absen piket malam
2026-03-03 17:02:12.565844
Pantauan awal piket cuaca hujan
 
operasi
2026-03-03 06:48:02.139478
Cek TMA pagi El 515.10
2026-03-03 12:03:46.837862
Cek tma siang elv 515.10
2026-03-03 17:18:32.762166
Cek TMA sore Elv 515.15
 
koordinator
2026-03-03 07:58:36.044039
Absen sore 2 petugas jaga malam afif dan ricky
2026-03-03 14:25:26.435030
Absen siang 2 petugas jaga malam afif dan ricky
2026-03-03 19:01:23.778799
Absen sore 2 petugas jaga malam afif dan ricky
 
pemantauan
2026-03-03 10:02:16.977306
Monitoring debit vnotch
2026-03-03 10:49:14.830775
Monitoring curah hujan 15.0mm

Bd Parangjoho


 
operasi
2026-03-03 07:04:12.032339
Mencatat debit outflow/inflow
2026-03-03 07:04:25.675619
Mengecek bukaan pintu intake
2026-03-03 07:04:44.233504
Mengukur curah hujan= 16.3 mm
2026-03-03 07:05:19.084847
Pembacaan peilschall TMA pagi 196.10 mdpl Volume = 790.111 m³
2026-03-03 11:30:31.396305
Pembacaan peilschall TMA siang 196.09 mdpl volume = 788.242 m³
2026-03-03 17:49:55.189797
Pembacaan peilschall TMA sore 196.54 mdpl volume =872.358 m³
 
pemantauan
2026-03-03 07:06:26.117941
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 7.5 cm = 2.17 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 2.62 lt/dt
2026-03-03 11:30:49.702407
Pemantauan visual rumah instrumentasi,kondisi baik
2026-03-03 11:32:01.672257
Pemantauan visual drainase lereng hilir,kondisi baik
 
koordinator
2026-03-03 07:21:03.305747
Absen pagi
2026-03-03 16:00:44.610808
Absen siang
2026-03-03 19:58:07.633831
Absen sore
2026-03-03 19:58:31.745495
Absen piket malam
 
keamanan
2026-03-03 11:31:31.527243
Patroli siang area kantor jaga terpantau aman
2026-03-03 11:32:05.206427
Patroli siang area lereng hulu terpantau aman
2026-03-03 11:33:28.466711
Patroli siang area intake terpantau aman
2026-03-03 11:34:36.620162
Patroli siang area kom waduk terpantau aman
2026-03-03 11:35:07.318266
Patroli siang area puncak bendung terpantau aman
2026-03-03 11:35:36.281120
Patroli siang area spill way terpantau aman
2026-03-03 11:36:44.967569
Patroli siang area kolam olak terpantau aman
2026-03-03 19:59:28.186945
Piket malam terpantau aman kondisi cuaca mendung

Bd Songputri


 
keamanan
2026-03-03 07:10:13.132127
Patroli pagi sekitar lapangan lereng hilir kondisi aman cuaca mendung
2026-03-03 16:29:02.132164
Patroli sore sekitar rumah intake kondisi aman cuaca mendung
2026-03-03 21:18:42.580069
Piket mlm kondisi aman cuaca mendung
2026-03-03 21:19:07.108930
Patroli mlm sekitar barat pos jaga kondisi aman cuaca mendung
 
operasi
2026-03-03 07:22:16.694316
Pembacaan TMA pagi elevasi 224.03 volume 431628 m³
2026-03-03 11:31:20.718541
Pembacaan TMA siang elevasi 224.02 volume 430676 m³
2026-03-03 15:58:17.474869
Buka pintu intake bawah, penurunan TMA waduk, pengendalian banjir, buang sedimen kom waduk
2026-03-03 17:15:20.287392
Pembacaan TMA sore elevasi 224.14 volume 442096 m³
 
koordinator
2026-03-03 07:36:55.668993
Absen pagi
2026-03-03 15:57:02.432301
Absen siang
2026-03-03 15:57:20.031779
Absen sore
 
pemantauan
2026-03-03 08:16:40.298974
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 11.5 cm (6.23 l/d)

Bd Kedunguling


 
pemantauan
2026-03-03 07:16:29.907723
Pemantauan secara visual pada intake 1. Kondisi baik / aman
2026-03-03 07:18:35.009920
Pemantauan secara visual pada lereng hulu tubuh bendungan.
2026-03-03 07:19:44.686830
Pemantauan secara visual pada puncak bendung. Retakan aspal pengeras bertambah dimensinya.
2026-03-03 07:20:50.785053
Pemantauan secara visual pada puncak bendungan. Retakan aspal pengeras bertambah dimensinya.
2026-03-03 07:21:34.633613
Penginputan dan rekap data hasil kegiatan pemantauan
 
operasi
2026-03-03 16:49:51.795472
Pengukuran TMA Pagi TMA 165.48 Volume 289363.0
2026-03-03 16:50:04.298587
Pengecekan curah hujan.
2026-03-03 16:50:19.219542
Input data TMA.
2026-03-03 16:51:01.459103
Pengukuran TMA Siang TMA 165.50 Volume 291806.0
2026-03-03 16:51:32.368004
Pengukuran TMA Sore TMA 165.64 Volume 308907.0
2026-03-03 16:51:47.605168
Monitoring saluran inflow.
2026-03-03 20:58:46.286787
Pengoperasian pintu spillway/pengendalian banjir.
 
koordinator
2026-03-03 20:56:42.494457
Absen pagi.
2026-03-03 20:57:20.194372
Babat rumput di lereng hulu tanggul selatan.
2026-03-03 20:57:41.721423
Absen siang.
2026-03-03 20:59:15.492649
Absen sore.
2026-03-03 21:00:14.797687
Absen malam (petugas piket : Gatot Susilo, Krisdianto dan Puguh Riyanto).

Bd Nawangan


 
pemantauan
2026-03-03 07:30:12.934651
Pemantauan v-nocth 1 debit 2.54 ltr/detik
2026-03-03 07:30:45.774920
Pemantauan v-nocth 2 debit 1.01 ltr/detik
2026-03-03 16:17:30.024175
Pemantauan atap pada rumah intake kondisi baik,dibantu petugas keamanan kawasan bendungan
2026-03-03 16:18:16.584722
Pemantauan lantai menara intake kondisi baik
2026-03-03 16:20:38.637772
Pemantauan tangga inspeksi dimenara intake kondisi sebagian berkarat.dibantu petugas keamanan bendungan
 
operasi
2026-03-03 07:31:12.467180
Tma pagi elevasi:229,03mdpl vol719590m3 limpas 3cm dengan debit:0.166m3/dt
2026-03-03 11:59:11.661396
Tma siang elevasi:229,02mdpl vol:719590m3 limpas 2cm dengan debit 0.090m3/dt
2026-03-03 18:04:18.979937
Tma sore elevasi:229,9mdpl vol:730713m3
 
keamanan
2026-03-03 16:15:43.191300
Patroli pagi di area lereng hulu bendungan kondisi aman
2026-03-03 16:16:04.399854
Patroli siang di area spilway bendungan kondisi aman
2026-03-03 16:16:43.629101
Patroli sore di area tugu prasasti bendungan kondisi aman
2026-03-03 19:24:48.856929
Piket mlm bd nawangan terpantau aman,cuaca mendung.petugas kiki setyawan,purwanto

Bd Pidekso


 
operasi
2026-03-03 07:41:31.525082
Elevasi tma pagi:185.18 Volume:25532833
2026-03-03 07:41:58.697976
Q_outflow bottom outlet:0.945 m³/detik
2026-03-03 12:56:56.975025
Elevasi tma siang:185.17 volume:25512412
2026-03-03 17:05:40.285329
Elevasi tma sore:185.21 volume:25594095
 
pemantauan
2026-03-03 18:19:15.798938
MONITORING KLIMATOLOGI SELASA 03.03.2026 Cuaca : MENDUNG 1. MAW : 185.18 2. CH : 19 mm 3. CH auto : - mm 4. Anemo : 1217493 5. Penguapan : 3 mm 6. Termo air : - C 7. Penyinaran : 155 menit 8. Radiasi : -W/m²l 9. Suhu max : - C 10. Kelembaban :- % 11. Termo : 31/28 C 12. Piscro. : 24/24 C **kondisi alat KLIMATOLOGI yang tidak terbaca karena sensor telemtri rusak, tidak bisa mengirim data ke server : 1.Curah hujan otomatis 2.Radiasi 3.Suhu max 4.Kelembapan 5.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk 6.Kelembapan 7.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk **KONDISI ALAT KLIMATOLOGI yang berfungsi : 1. Anemometer (baik) 2. 2. Bak penguapan (baik) 3. 3.Penyinaran (baik) 4. 4.Radiasi matahari (baik) 5. 5.Termometer (baik) 6. 6.Piscrometer(baik
 
keamanan
2026-03-03 19:21:45.147572
Patroli area akses masuk fasum kondisi terpantau aman
2026-03-03 19:22:03.626067
Pengecekan papan papan larangan kondisi terpantau aman
2026-03-03 19:22:21.148732
Patroli area lereng hilir kondisi terpantau aman
2026-03-03 19:22:36.248007
Patroli area lereng hulu kondisi terpantau aman
2026-03-03 19:22:52.878950
Patroli area puncak tubuh bendung kondisi terpantau aman

Bd Botok


 
keamanan
2026-03-03 07:50:27.371411
Patroli pagi kondisi aman
 
operasi
2026-03-03 08:24:43.479111
Membuka pintu pengguras guna mengurangi sedimen ditapal kuda
2026-03-03 08:27:01.211939
Pengendalian banjir di suplesi bendung jetis
2026-03-03 08:28:56.313012
Pembacaan outflow intake
2026-03-03 08:30:50.092273
Pembacaan TMA pagi hari
2026-03-03 19:08:02.290858
Pembacaan TMA sore hari

Bd Ngancar


 
operasi
2026-03-03 08:21:32.035939
TMA PAGI , ELEVASI : 248.77 mdpl , VOLUME : 1.727.538 m³
2026-03-03 11:59:33.908574
TMA SIANG, ELEVASI : 248.77 mdpl, VOLUME : 1.727.538 m³
2026-03-03 16:25:56.050239
Tma sore E 248.82 MDPL volume:1.741.869 m3
 
koordinator
2026-03-03 08:43:03.190828
Absen pagi.
 
pemantauan
2026-03-03 12:03:09.790998
Pemantauan V-notch H: 8 cm Q: 4.41 L/detik
2026-03-03 12:04:22.913757
Pemantauan V-notch 2. tidak ada rembesan
2026-03-03 12:04:55.540226
Puncak bendungan (pagar pengaman sebagai sudah berkarat dan parapet aus)
 
keamanan
2026-03-03 20:02:44.535984
Piket malam bendungan Ngancar cuaca mendung kondisi aman petugas Bayu dan ramadhan

Bd Pondok


 
pemantauan
2026-03-03 08:31:18.462029
Pemeriksaan TMA
2026-03-03 08:31:37.720845
Pemeriksaan puncak bendungan kondisi baik.

Bd Lalung


 
operasi
2026-03-03 08:35:40.693159
cek tma pagi elevasi 150.21 m,volume 3331015 m3
 
keamanan
2026-03-03 17:44:37.460567
Patroli sore.kondisi aman,cuaca hujan deras

Bd Plumbon


 
operasi
2026-03-03 09:12:00.639993
Pembacaan TMA pagi. El 203,95 mdpl. Vol 318.149 m3
 
pemantauan
2026-03-03 13:19:48.196772
Pemeriksaan visual v notch 2. Kondisi ada sisa genangan air hujan. Peilschale tidak ada. Plesteran sisi bawah rusak.
2026-03-03 13:23:46.338871
Pemeriksaan visual puncak tubuh bendungan. Kondisi papan nomlekatur terpantau baik, lampu nomlekatur tidak menyala. Bangunan penakar curah hujan terpantau baik.
2026-03-03 13:24:39.566661
Pemeriksaan visual puncak tubuh bendungan. Terdapat 2 buah lampu penerangan kondisi menyala baik.
2026-03-03 13:26:14.695733
Pemeriksaan visual puncak tubuh bendungan. Kondisi portal masuk dan keluar sisi utara terpantau baik, beberapa jeruji pagar hilang. Gembok berfungsi baik.

Bd Mulur


 
koordinator
2026-03-03 09:40:27.840254
absen pagi
 
pemantauan
2026-03-03 15:25:49.500981
pengecekan fisik area saluran suplesi perlu adanya pengerukan sedimen
2026-03-03 15:26:30.542836
pengecekan fisik area spilway.dan saluran sekunder bangunan aman dinding pembatas saluran baik
2026-03-03 15:27:00.987812
pengukuran curah hujan ch :30.5
 
keamanan
2026-03-03 20:33:40.760033
Patroli malam area tangga dan rumah intake 1
2026-03-03 20:34:03.694995
Piket malam kondisi aman

Bd Bendo


 
koordinator
2026-03-03 09:57:22.108662
Monitoring petugas OP Penyemprotan rumput liar menggunakan pestisida
 
keamanan
2026-03-03 13:49:58.336604
Penyemprotan rumput liar menggunakan pestisida
 
pemantauan
2026-03-03 13:50:19.976471
Penyemprotan rumput liar area riprap hilir pada tubuh Bendungan menggunakan pestisida
 
operasi
2026-03-03 13:50:45.289415
Penyemprotan rumput liar menggunakan pestisida

Bd Pacal


 
pemantauan
2026-03-03 10:14:01.114390
Pengukuran V-notch di hilir kanan dan kiri
 
operasi
2026-03-03 12:26:16.763299
TMA siang : 115.08 mdpl Volume : 22,698,835 m³
 
keamanan
2026-03-03 12:58:46.951659
Patroli area genanggan, puncak bendunggan dan area kantor kondisi terpantau aman cuaca berawan.
2026-03-03 15:12:42.540177
Patroli siang Sepilway pacal dan taman terpantau aman cuaca mendung
2026-03-03 15:14:15.083131
Patroli sore sepilway pacal dan taman terpantau aman cuaca mendung
2026-03-03 20:21:41.225655
Patroli malam sepillway pacal terpantau aman, cuaca mendung

Bd Prijetan


 
operasi
2026-03-03 10:39:06.057626
Pembacaan tma:49.07 mdpl volume:9.544.379m³.
 
keamanan
2026-03-03 12:37:08.505705
Bd prijetan kondisi terpantau aman cuaca cerah
2026-03-03 12:41:52.341306
Pengamanan kawasan dipuncak Bendungan kondisi terpantau aman
2026-03-03 12:42:15.405631
Pengamanan kawasan disekitar area genangan waduk kondisi terpantau aman

Bd Kedung Brubus


 
operasi
2026-03-03 11:01:41.196758
Kegiatan operasi menambah bukasn pintu intike untuk pengedalian banjir

Bd Ketro


 
keamanan
2026-03-03 11:21:48.065721
Patroli siang pada puncak bendung
2026-03-03 21:23:38.560846
Patroli malam diarea pembagi kondisi aman

Bd Cengklik


 
pemantauan
2026-03-03 11:48:35.442720
cek v notc
2026-03-03 11:49:25.495453
cek kantor bendung

Bd Gonggang


 
pemantauan
2026-03-03 12:02:19.959782
Vnotch 2,5 cm debit 0,15 liter/detik
 
keamanan
2026-03-03 19:06:42.001428
*LAPORAN PIKET* Bendungan Gonggang Pukul : 19.03 WIB *1. Data Bendungan dan Waduk* Cuaca : Gerimis Curah hujan saat ini : 17.0 mm El. MA terkini : 810.11 m Volume terkini : 1954116.0 m3 *2. Kondisi Spilway* Saat ini kondisi Spillway *mengalami* limpasan Ketinggian Limpasan : 11.0 cm Debit Limpasan : 0.394 m3/dt *3. Kondisi visual bendungan : Aman * *4. Nama petugas piket* - A. Ariyanto, Shihabudin

Bd Delingan


 
operasi
2026-03-03 14:04:59.699191
Pengukuran Tma: 204.88 mdpl Volume: 3243579 m³ dengan curah hujan: 14 mm cuaca: cerah secara visual menara dan pintu intake aman kondusif
 
pemantauan
2026-03-03 14:05:44.077485
Pembacaan vnotch Kiri H: 8.0 cm Q: 2.55 l/dt Kanan H: 7.0 cm Q: 1.83 l/dt kualitas air jernih. Petugas: Agung w dan Pujianto
2026-03-03 14:06:30.474429
Inspeksi visual pada lereng hilir sebelah utara. Tidak ditemukan rembesan, penurunan tidak ada perubahan, dan instrumentasi yang terpasang kondisi baik tidak ada kerusakan. Petugas: Agung dan Pujianto
 
koordinator
2026-03-03 20:11:45.461396
Patroli sore area kantor Op atau jaga serta kawasa jalan inspeksi dan lainnya secara visual kondusif aman cuaca pasca hujan
2026-03-03 21:47:51.104140
Patroli malam bendungan secara visual aman dan sepi selalu dipantau cuaca gerimis
 
keamanan
2026-03-03 21:41:02.499650
*LAPORAN PIKET* Bendungan Delingan Pukul : 20.14 WIB *1. Data Bendungan dan Waduk* Cuaca : Gerimis Curah hujan saat ini : 48.0 mm El. MA terkini : 204.92 m Volume terkini : 3267566.0 m3 *2. Kondisi Spilway* Saat ini kondisi Spillway *mengalami* limpasan Ketinggian Limpasan : 6.0 cm Debit Limpasan : 0.754 m3/dt *3. Kondisi visual bendungan : Aman* *4. Nama petugas piket* - Wahyu Purwanto, Agung Wahyudi