UNIT PENGELOLA BENDUNGAN

    Kegiatan Petugas Bendungan 2026-03-01

    28

Bd Pacal


 
keamanan
2026-03-01 00:14:35.250823
Patroli mlm bd pacal terpantau aman, cuaca mendung

Bd Sangiran


 
operasi
2026-03-01 05:39:46.474028
Cek tma elv :127.72 mdpl Vol :10419833 m³ Ch :4.5 mm Dbit inflow :0.414 m³/dt Dbit spillway :0.188 m³/dt

Bd Prijetan


 
keamanan
2026-03-01 05:42:34.476640
Monitoring pembacaan TMA pagi bd Prijetan
2026-03-01 14:59:56.588026
Pengamanan kawasan dilereng Hulu Bendungan kondisi terpantau aman
2026-03-01 15:00:15.414782
Pengamanan kawasan dilereng Hilir Bendungan kondisi terpantau aman
 
operasi
2026-03-01 14:17:53.937267
Pembacaan tma:49.09 mdpl volume:9.591.543m³.

Bd Gondang2


 
keamanan
2026-03-01 05:58:57.753538
Absen turun piket malam
2026-03-01 05:59:29.214774
Pantauan pagi bd gondang cuaca berawan terpantau aman
2026-03-01 16:43:37.114759
Patroli siang terpantau aman cuaca cerah
2026-03-01 17:08:04.961050
Absen piket malam
2026-03-01 17:08:50.740396
Pantauan awal piket malam cuaca berawan
 
operasi
2026-03-01 08:17:58.533749
Cek tma pagi elv 515.18
2026-03-01 11:26:08.653967
Cek tma siang elv 515.15
2026-03-01 17:06:39.833502
Cek TMA sore Elv 515.13
 
koordinator
2026-03-01 11:26:36.771149
Standby

Bd Tukul


 
keamanan
2026-03-01 06:07:02.912089
Patroli pagi puncak bendungan aman. Area limpasan aman. Kantor aman. Mematikan lampu. Dokumentasi laporan. Cuaca mendung
2026-03-01 14:57:59.976768
Patroli siang lokasi puncak bendungan kondisi visual aman
 
pemantauan
2026-03-01 07:30:03.043807
Monitoring TMA pagi-siang-sore
2026-03-01 07:30:37.170126
Monitoring curah hujan data : 17.5 mm
2026-03-01 08:02:44.124588
Monitoring 37 VW Pizometer kondisi baik namun FP 3 dan FP 6, EP 4 dan EP 14 bacaan anomali, monitoring 9 VW Pressure Cell kondisi baik namun pembacaan anomali pada bacaan sensor EP 6
2026-03-01 15:44:09.918372
Pembersihan halaman kantor

Bd Blimbing


 
operasi
2026-03-01 06:11:29.822654
Monitoring tma pagi elevasi 189.48 m volume 22711 m³
2026-03-01 06:11:54.063131
Penakaran curah hujan 16 mm
2026-03-01 17:56:24.480789
Monitoring tma sore elevasi 189.50 m volume 22925 m³

Bd Songputri


 
keamanan
2026-03-01 06:30:11.351438
Patroli pagi sekitar genagan lereng hulu kondisi aman cuaca berawan
2026-03-01 17:30:13.701910
Patroli siang sekitar jalan akses ke bendungan kondisi aman cuaca berawan
2026-03-01 17:30:49.843075
Patroli sore sekitar pos jaga kondisi aman cuaca berawan
2026-03-01 19:31:43.401868
Patroli mlm sekitar puncak bendungan kondisi aman cuaca berawan
 
koordinator
2026-03-01 06:31:08.695001
Absen pagi
2026-03-01 17:29:26.858536
Absen siang
2026-03-01 17:29:38.573413
Absen sore
2026-03-01 19:31:14.294038
Piket mlm
 
operasi
2026-03-01 06:44:11.212562
Pembacaan TMA pagi elevasi 224.05 volume 433531 m³
2026-03-01 12:50:46.436319
Pembacaan TMA siang elevasi 224.04 volume 432580 m³
2026-03-01 18:25:43.779356
Pembacaan TMA sore elevasi 224.03 volume 431628 m³
 
pemantauan
2026-03-01 07:54:23.663186
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 12.8 cm (8.13l/d)

Bd Gondang


 
operasi
2026-03-01 06:32:26.393042
Cek TMA pagi elevasi saat ini 38,22mdpl volume 20.661.975m³
 
pemantauan
2026-03-01 15:25:18.561561
pemantauan rembesan di saluran vnoth

Bd Nawangan


 
operasi
2026-03-01 06:33:41.864806
Tma pagi elevasi:229,04mdpl vol:721446m3 limpas 4cm dengan debit 0.256m3/dt
2026-03-01 11:22:36.417016
Tma siang elevasi:229,03 vol:719590m3 limpaps 3cm dengan debit 0,166m3
2026-03-01 16:47:39.998157
Tma sore elevasi:229,02mdpl vol:717736m3 limpas 2cm dengan debit 0.090m3/dt
 
pemantauan
2026-03-01 15:34:13.219218
Pemantauan v-nocth 1 debit 3.49 ltr/detik
2026-03-01 15:35:06.944893
Pemantauan v-nocth 2 debit 1.83 ltr/detik
 
keamanan
2026-03-01 19:07:32.584874
Piket malam Bendungan Nawangan, kondisi aman cuaca cerah. petugas piket Fitrianto dan Agung Setiyono

Bd Gongseng


 
keamanan
2026-03-01 06:36:21.689566
Patroli pagi keadaan kondusif cuaca cerah
2026-03-01 11:04:47.850528
Patroli siang keadaan aman cuaca cerah
2026-03-01 14:32:42.545379
Patroli sore keadaan kondusif cuaca berawan
 
pemantauan
2026-03-01 14:48:05.638445
Pembacaan curah hujan

Bd Krisak


 
operasi
2026-03-01 06:39:27.425378
Tma pagi elevasi 113.70m volume 2.432.168m3
2026-03-01 06:39:43.061989
Buka pintu intake
2026-03-01 11:58:22.645941
Tma siang elevasi 113.58m volume 2.372.657m3
2026-03-01 11:58:46.317059
Ukur curah hujan 0.0 mm
2026-03-01 11:59:01.050364
Pengisian data web
2026-03-01 11:59:36.672733
Pengisian data log book
2026-03-01 16:11:26.783590
Tma sore elevasi 113.54m volume 2.358.924m3
 
keamanan
2026-03-01 06:45:18.214394
Kondisi puncak bendungan aman
2026-03-01 06:46:12.019566
Lereng hilir kondisi aman
2026-03-01 06:47:12.615979
Pintu intake kondisi aman
2026-03-01 19:16:14.424585
Piket malam terpantau aman
 
pemantauan
2026-03-01 06:54:41.474618
Pemantauan vnotch h=15cm q=12.07lt/dt
2026-03-01 15:54:08.064056
Pemantauan gorong gorong kondisi bangunan baik
2026-03-01 15:54:29.284132
Pemantauan puncak bendungan kondisi lapisan pengeras jalan puncak bendungan baik

Bd Parangjoho


 
operasi
2026-03-01 06:49:00.777127
Mengukur curah hujan 19.2 mm
2026-03-01 06:49:01.299426
Mengecek bukaan pintu intake
2026-03-01 06:49:26.457246
Pembacaan peilschall TMA pagi 196.12 mdpl volume = 793.850 m³
2026-03-01 06:50:51.581493
Mencatat debit outflow/inflow
2026-03-01 11:45:34.252370
Pembacaan peilschall TMA siang 196.09 mdpl volume = 788.242 m³
2026-03-01 16:16:44.818403
Pembacaan peilschall TMA siang 196.06 mdpl volume = 782.634m³
 
pemantauan
2026-03-01 06:50:17.760400
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 7.6 cm = 2.24 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 2.69 lt/dt
 
koordinator
2026-03-01 11:27:00.657856
Absen pagi
2026-03-01 15:57:36.423026
Absen siang
2026-03-01 16:17:05.641662
Absen siang
 
keamanan
2026-03-01 11:46:06.701042
Patroli area menara intake terpantau aman
2026-03-01 11:46:38.472074
Patroli area kolam olak terpantau aman
2026-03-01 11:47:06.592820
Patroli puncak bendungan terpantau aman
2026-03-01 11:47:31.849778
Patroli lereng hilir terpantau aman
2026-03-01 11:47:59.942624
Patroli spillway terpantau aman
2026-03-01 11:48:30.448468
Patroli area kom waduk terpantau aman
2026-03-01 15:53:09.488019
Patroli area kantor jaga terpantau aman

Bd Gebyar


 
operasi
2026-03-01 06:58:43.124429
Pembacaan TMA pagi, Elevasi = 325.20mdpl, Vol = 591297m³

Bd Brambang


 
operasi
2026-03-01 07:01:49.482885
cek tma pagi dan pantauan pagi
2026-03-01 14:06:57.327096
Cek tma siang
 
keamanan
2026-03-01 11:11:39.171134
Patroli pagi intake sekitar aman cuaca cerah
2026-03-01 12:43:38.286362
Pantauan siang wilayah barat sekitar aman cuaca cerah
2026-03-01 17:47:13.043896
Pantauan sore wilayah Utara sekitar aman cuaca mendung

Bd Gembong


 
koordinator
2026-03-01 07:17:52.958616
Absen piket pagi
 
keamanan
2026-03-01 07:18:42.129478
Patroli pagi kondisi visual bendungan terpantau aman
 
pemantauan
2026-03-01 07:47:53.354930
Mengukur curah hujan : 34 mm cuaca cerah
 
operasi
2026-03-01 07:48:25.807587
Pembacaan Tma pagi : 119,76 m volume : 16,180 m³

Bd Pidekso


 
operasi
2026-03-01 07:42:02.191262
Elevasi tma pagi:185.33 volume:25873812
2026-03-01 07:42:40.528879
Q_outflow bottom outlet:0.948 m³/detik
2026-03-01 13:22:12.618021
Elevasi tma siang:185.26 volume:25723513
2026-03-01 16:35:58.030619
Elevasi tma sore:185.24 volume:25680570

Bd Lalung


 
operasi
2026-03-01 07:51:33.211592
Cek tma pagi elevasi 150.24 m volume 3349641m3
2026-03-01 17:02:42.599231
Cek tma siang elevasi 150.24m volume 3349641m3
2026-03-01 17:06:51.866070
Cek tma sore elevasi 150.24m volume 3349641m3
 
keamanan
2026-03-01 09:05:01.287929
Patroli pagi.kondisi aman,cuaca saat ini cerah(petugas:nur rokhim)
2026-03-01 16:22:10.136283
Patroli sore.kondisi aman,cuaca berawan

Bd Kedung Brubus


 
operasi
2026-03-01 08:04:38.280165
Kegiatan rutin hari minggu tma 109.74 m volume 942451.0m3

Bd Ngancar


 
operasi
2026-03-01 08:42:10.665803
TMA PAGI , ELEVASI : 248.80 mdpl , VOLUME : 1.736.116 m³
2026-03-01 12:12:43.930709
TMA SIANG , ELEVASI : 248.80 mdpl , VOLUME : 1.736.116 m³
2026-03-01 18:03:48.614337
TMA SORE , ELEVASI : 248.79 mdpl , VOLUME : 1.733.257 m³
 
keamanan
2026-03-01 18:42:18.839145
piket malam kondisi terpantau aman, cuaca berawan , petugas piket fatnika dan ekwan

Bd Botok


 
pemantauan
2026-03-01 10:23:10.013979
Pengukuran curah hujan dengan hasil 23 mm
2026-03-01 10:23:43.502301
Pengukuran rembesan,v-notch 1 peilskal 0,debit 0
 
keamanan
2026-03-01 10:24:23.746603
Patroli pagi kondisi aman
2026-03-01 10:24:52.871998
Patroli pagi kondisi aman
 
operasi
2026-03-01 10:26:34.517310
Cek tma pagi
2026-03-01 10:27:36.907419
Pembacaan debit out flow
2026-03-01 12:34:04.388609
Pembacaan tma siang
 
koordinator
2026-03-01 12:35:11.027757
Absen siang piket minggu

Bd Gonggang


 
pemantauan
2026-03-01 10:23:47.416086
Puncak sebagian bergelombang, perlu penambahan batu disebelah utara dan selatan
2026-03-01 10:24:15.452716
Vnotch 2,5 cm debit 0,15 liter/detik
 
koordinator
2026-03-01 13:35:22.000181
Memantau cuaca pagi cerah, kondisi puncak bendungan, bukit tumpuan, TMA Waduk, lereng hulu hilir, area grendbeld dan waduk ( Inflow waduk ), bangunan pengeluaran, peralatan BDSF, klimatologi dan spilway aman kondusif.

Bd Ketro


 
keamanan
2026-03-01 11:30:42.556579
Patroli siang pada bangunan intake

Bd Kedung Bendo


 
operasi
2026-03-01 14:09:00.646037
Cek saluran autlide..

Bd Kedunguling


 
operasi
2026-03-01 17:00:20.679953
Pengukuran TMA Pagi TMA 165.67 Volume 312571.0
2026-03-01 17:02:44.915965
Pengukuran TMA Siang TMA 165.63 Volume 307685.0
2026-03-01 17:03:53.062603
Pengukuran TMA Sore TMA 165.60 Volume 304021.0

Bd Kembangan


 
operasi
2026-03-01 18:17:34.842302
Cek tma pagi siang sore

Bd Jombor


 
keamanan
2026-03-01 18:36:29.271797
*LAPORAN PIKET* Bendungan Jombor Pukul : 18.35 WIB *1. Data Bendungan dan Waduk* Cuaca : Berawan Curah hujan saat ini : 0.0 mm El. MA terkini : 119.1 m Volume terkini : 3450109.0 m3 *2. Kondisi Spilway* Saat ini kondisi Spillway *mengalami* limpasan Ketinggian Limpasan : 10.0 cm Debit Limpasan : 3.794 m3/dt *3. Kondisi visual bendungan : Limpasan Aman* *4. Nama petugas piket* - Ersan Endra Cahya

Bd Delingan


 
operasi
2026-03-01 18:50:47.761727
Pengukuran tma: 204.86 mdpl Volume: 3231585 m³ Curah hujan: 12 mm kondisi pintu intake normal cuaca cerah
 
pemantauan
2026-03-01 18:59:22.149941
Pembacaan vnotch Kiri H: 8.0 cm Q: 2.55 l/dt Kanan H: 7.0 cm Q: 1.83 l/dt kualitas air jernih. Petugas: Agung w dan Pujianto
 
keamanan
2026-03-01 18:59:51.613991
Patroli bendungan area kantor, jalan inspeksi, dan puncak kondisi visual tidak terlalu ramai tetapi selalu di awasi cuaca cerah

Bd Mulur


 
keamanan
2026-03-01 19:28:00.207125
Piket malam dan stanbay