UNIT PENGELOLA BENDUNGAN

    Kegiatan Petugas Bendungan 2026-02-10

    33

Bd Pacal


 
keamanan
2026-02-10 00:10:24.698235
Patroli mlm bd pacal terpantau aman, cuaca berawan
2026-02-10 00:20:16.420385
Patroli mlam sepilway pacal dan taman terpantau aman cuaca berawan
 
operasi
2026-02-10 12:08:43.707756
TMA siang : 114,92 mdpl Volume : 22.046.749 m³
2026-02-10 12:09:37.747275
TMA pagi : 114,92 mdpl Volume : 22.046.749 m³

Bd Gondang2


 
pemantauan
2026-02-10 06:04:06.541555
Monitoring curah hujan 17.9mm
2026-02-10 17:12:48.533703
Monitoring piezometer
 
keamanan
2026-02-10 06:14:14.109264
Pantauan pagi cuaca mendung dan aman
2026-02-10 06:29:55.296416
Absen turun piket
2026-02-10 17:12:23.208604
Absen piket malam
2026-02-10 17:12:55.441112
Pantauan awal piket cuaca grimis
 
operasi
2026-02-10 06:14:55.063892
Cek TMA pagi El 515.12
2026-02-10 13:57:58.833345
Cek tma siang elv 515.09
2026-02-10 17:13:28.579966
Cek TMA sore Elv 515.08
 
koordinator
2026-02-10 07:55:17.856619
Absen pagi 2 petugas jaga malam afif dan ricky
2026-02-10 13:40:47.044893
Absen siang 2 piket malam Riki dan Afif 1 mas Tarmin kemasyarakatan
2026-02-10 16:05:28.477605
Absen sore 2 petugas jaga malam afif dan ricky

Bd Sangiran


 
operasi
2026-02-10 06:05:58.938801
Cek tma elv :127.72 mdpl Vol :10419833 m³ Dbit inflow :0.238 m³/dt Dbit spillway :0.188 m³/dt

Bd Krisak


 
keamanan
2026-02-10 06:16:28.526219
Kondisi lereng hilir aman
2026-02-10 06:16:44.806096
Kondisi puncak bendungan aman
2026-02-10 06:17:00.224800
Kondisi pintu intake aman
 
operasi
2026-02-10 06:18:56.488535
Tma pagi elevasi 112.97m volume 2.098.935m3
2026-02-10 06:19:48.138770
Ukur curah hujan 15.2 mm
2026-02-10 06:20:03.556033
Pengisian data web
2026-02-10 06:20:16.746455
Pengisian data log book
2026-02-10 13:19:19.094011
Tma siang elevasi 113.01m volume 2.116.305m3
2026-02-10 16:36:18.387297
Tma sore elevasi 113.04m volume 2.130.038m3
 
pemantauan
2026-02-10 06:32:22.690659
Pemantauan vnotch h=10cm q=4.41lt/dt
2026-02-10 10:28:45.197057
Pemantauan puncak bendungan pengamatan kelurusan pagar pengaman puncak bendungan kondisi baik
2026-02-10 10:29:08.458006
Pemantauan lereng hulu pasangan batu rip rap lereng hulu kondisi baik
 
koordinator
2026-02-10 12:02:43.491236
Absen pagi

Bd Blimbing


 
operasi
2026-02-10 06:18:17.982646
Monitoring tma pagi elevasi 189.29 m volume 20675 m³
2026-02-10 06:18:43.876495
Penakaran curah hujan 27.5 mm
2026-02-10 11:06:19.087127
Monitoring tma siang elevasi 189.31 m volume 20889 m³
2026-02-10 17:20:21.131506
Monitoring tma sore elevasi 189.31 m volume 20889 m³
 
keamanan
2026-02-10 06:52:39.944197
Patroli keamanan pagi kondisi aman
2026-02-10 17:28:05.495709
Patroli keamanan sore kondisi aman
 
pemantauan
2026-02-10 06:53:36.393346
Pemantauan visual pagi cuaca mendung
2026-02-10 17:27:39.952551
Pemantauan visual sore cuaca mendung
 
koordinator
2026-02-10 07:36:23.623726
Absen pagi
2026-02-10 17:28:37.571007
Absen sore
2026-02-10 17:29:00.451911
Absen siang

Bd Gongseng


 
keamanan
2026-02-10 06:37:52.303844
Patroli pagi aman, cuaca mendung.
2026-02-10 15:06:17.330792
Patroli siang kondusif, cuaca cerah berawan.
2026-02-10 15:06:59.380293
Patroli sore Alhamdulillah aman, cuaca cerah berawan.
 
pemantauan
2026-02-10 12:15:19.783735
Pembacaan cssp puncak bendung

Bd Gembong


 
koordinator
2026-02-10 06:37:55.814633
Absen akhir piket malam dan pantauan pagi
2026-02-10 08:42:45.190560
Absen pagi
2026-02-10 10:59:48.085648
Breafing pagi
2026-02-10 11:00:13.373102
Merekap hasil pantauan lapangan di loogbok harian
2026-02-10 16:01:41.303926
Absen siang
2026-02-10 16:01:58.134498
Absen sore
2026-02-10 18:14:03.235399
Absen piket sore
 
keamanan
2026-02-10 06:38:15.912950
Patroli pagi kondisi aman cuaca gerimis
2026-02-10 18:13:23.554473
Patroli sore kondisi visual bendungan terpantau aman
 
pemantauan
2026-02-10 06:38:32.119735
Cek curah hujan 22 mm
2026-02-10 06:42:01.818722
Monitoring pasangan hulu rusak
2026-02-10 06:43:06.574791
Monitoring pasangan hulu selatan tanah bagian puncak mengalami penurunan
2026-02-10 06:43:49.241380
Monitoring pasangan hulu selatan retak menyebabkan kebocoran
 
operasi
2026-02-10 06:39:51.220801
Pembacaan Tma pagi : 119,76 m volume : 16180 m³
2026-02-10 12:29:43.883382
Pembacaan Tma siang : 119,76 m volume : 16,180 m³
2026-02-10 18:12:31.197583
Pembacaan Tma sore : 119,76 m volume : 16,180 m³

Bd Gebyar


 
operasi
2026-02-10 06:46:22.682540
Pembacaan TMA pagi, Elevasi = 325.20mdpl, Vol = 591297m³

Bd Brambang


 
keamanan
2026-02-10 06:47:30.114580
Patroli pagi wilayah barat Setar aman cuaca gerimis
2026-02-10 12:31:57.437168
Patroli siang kawasan bd aman cuaca mendung
 
operasi
2026-02-10 07:22:51.370614
cek tma pagi dan membantu op pemeliharaan
2026-02-10 11:28:25.041445
Cek tma siang
2026-02-10 16:55:12.324037
Cek tma sore dan pantauan sore
 
koordinator
2026-02-10 07:52:27.400480
Absen Turun Piket
2026-02-10 12:57:30.350030
Absen Pagi
2026-02-10 15:57:52.321000
Absen Siang
2026-02-10 17:38:39.347550
Absen sore
2026-02-10 17:39:07.382400
Absen piket malam
 
pemantauan
2026-02-10 07:53:46.333931
Pengukuran CH 17.2 mm Cuaca mendung
2026-02-10 07:54:35.695184
Pemantauan kondisi lereng hilir

Bd Parangjoho


 
operasi
2026-02-10 06:49:16.905224
Mengukur curah hujan 21.2 mm
2026-02-10 06:49:25.388400
Mencatat debit outflow/inflow
2026-02-10 06:49:44.576618
Mengecek bukaan pintu intake
2026-02-10 06:50:11.058848
Pembacaan peilschall TMA pagi 196.06 mdpl volume = 782.634 m³
2026-02-10 11:46:33.631953
Pembacaan peilschall TMA siang 196.03 mdpl volume = 777.026 m³
2026-02-10 17:57:54.350613
Pembacaan peilschall TMA sore 196.02 mdpl volume = 775.157 m³
 
pemantauan
2026-02-10 06:55:46.866614
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 6.4 cm = 1.47 lt/dt, v-notch no 3= 2.3 cm = 0.12 lt/dt, total debit = 1.90 lt/dt
2026-02-10 11:47:08.658431
Pemantauan visual jalur akses ke lereng hilir kondisi baik
2026-02-10 11:47:30.851600
Pemantauan visual rumah instrumentasi,kondisi baik
 
keamanan
2026-02-10 11:47:57.106996
Patroli area kolam olak aman
 
koordinator
2026-02-10 16:05:20.801661
Absen pagi
2026-02-10 16:05:44.753520
Absen siang
2026-02-10 16:06:36.085248
Absen sore

Bd Lalung


 
operasi
2026-02-10 06:52:45.493193
Cek tma pagi elevasi 150.43m volume 3467061m3
2026-02-10 12:02:46.564255
Cek tma siang elevasi 150.43m volume 3467061m3
2026-02-10 18:22:46.390638
Cek tma sore elevasi 150.43m volume 3467061 m3
 
pemantauan
2026-02-10 10:03:56.969333
Pemantauan tanggul lereng hilir sisi barat, kondisi baik.
 
keamanan
2026-02-10 10:08:37.300190
Patroli pagi.kondisi aman,cuaca saat ini cerah(petugas:nur rokhim)
2026-02-10 17:49:18.635795
Patroli sore.kondisi aman,cuaca gerimis
 
koordinator
2026-02-10 17:02:28.338586
patroli sore di kawasan bendungan kondisi aman cuaca mendung

Bd Gondang


 
operasi
2026-02-10 06:57:15.315888
Cek TMA pagi elevasi saat ini 38,01mdpl volume 19.812.246m³

Bd Nawangan


 
operasi
2026-02-10 07:09:07.127369
Tma pagi elevasi:226.73mdpl vol:503338m3
2026-02-10 11:54:23.991261
Tma siang elevasi:226,73mdpl vol:503338m3
2026-02-10 17:04:22.164721
Tma sore elevasi:226,74mdpl vol:504240m3
 
pemantauan
2026-02-10 07:14:19.971782
Pemantauan v-nocth 1 debit 0.92 ltr/detik
2026-02-10 07:14:52.449151
Pemantauan v-nocth 2 debit 0.09 ltr/detik
2026-02-10 16:40:03.239016
Pemantauan portal sebelah timur dan barat kondisi rusak
2026-02-10 16:40:33.057035
Pemantauan lampu penerangan jumlah 12 buah kondisi kurang terang,dibantu petugas keamanan kawasan
2026-02-10 16:41:07.882032
Pemantauan pagar sebelah hulu puncak bendungan panjang sampai spillway 2.80m tinggi 1.75m
 
koordinator
2026-02-10 07:41:28.688052
Apel pagi
 
keamanan
2026-02-10 16:10:32.948487
Patroli pagi di area lereng hulu kondisi aman
2026-02-10 16:10:58.357553
Patroli siang di area spilway bendungan kondisi aman
2026-02-10 16:11:25.081724
Patroli sore di area tugu prasasti bendungan kondisi aman

Bd Songputri


 
keamanan
2026-02-10 07:20:53.488499
Patroli pagi sekitar lereng hilir kondisi aman cuaca berawan
2026-02-10 11:21:59.512027
Patroli siang sekitar jalan akses kondisi aman cuaca berawan
2026-02-10 16:31:52.543096
Patroli sore sekitar spillway kondisi aman cuaca berawan
 
koordinator
2026-02-10 07:35:39.974090
Absen pagi
2026-02-10 16:32:06.848600
Absen sore
 
operasi
2026-02-10 07:36:36.762996
Pembacaan TMA pagi elevasi 223.75 volume 404981 m³
2026-02-10 11:23:29.138941
Pembacaan TMA siang elevasi 223.76 volume 405933 m³
2026-02-10 18:20:32.102094
Pembacaan TMA sore elevasi 223.77 volume 406884 m³
 
pemantauan
2026-02-10 07:38:47.447564
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran,9.8 cm (4.19 l/d)

Bd Ngancar


 
operasi
2026-02-10 07:35:04.089415
TMA PAGI , ELEVASI : 247.72 mdpl , VOLUME : 1.436.228 m³
2026-02-10 10:59:01.512721
Tma siang E 247.72 MDPL volume:1.436.228 m3
 
koordinator
2026-02-10 07:55:10.393140
Absen pagi
 
pemantauan
2026-02-10 16:50:44.494935
Pemantauan V-notch H:6 cm Q:1.25 L/detik
2026-02-10 16:52:58.404373
Pemantauan V-notch 2. tidak ada rembesan
2026-02-10 16:54:56.731910
Bangunan intake (atap dan besi tralis dalam kondisi normal)
 
keamanan
2026-02-10 18:32:08.308009
Patroli area nomen klatur terpantau aman

Bd Botok


 
keamanan
2026-02-10 07:53:18.830042
Patroli pagi kondisi aman
 
operasi
2026-02-10 08:40:09.751956
Pembacaan TMA pagi Peilschall 6.46 m Elevasi 282.03 Mdpl Volume 350146 m³
2026-02-10 08:40:44.285863
Pembacaan outflow intake 0.30 cm Debit 0.917 m³/detik
2026-02-10 08:41:44.873427
Menghitung debit outflow dan inflow, merekap hasil dilog book neraca air waduk dan meneruskan laporan pada web
2026-02-10 12:12:18.006911
Pembacaan TMA siang hari
2026-02-10 17:37:23.059066
Pembacaan TMA sore hari

Bd Pidekso


 
operasi
2026-02-10 08:02:44.034821
Elevasi tma pagi:182.84 Volume:20877941
2026-02-10 08:03:06.950986
Q_outflow bottom outlet:0.902 m³/detik
2026-02-10 13:23:57.292742
Elevasi tma siang:182.83 volume:20859363
2026-02-10 16:18:17.967411
Elevasi tma sore:182.85 volume:20896519
 
keamanan
2026-02-10 11:33:41.807264
Pengecekan papan papan larangan kondisi terpantau aman
2026-02-10 11:34:00.299812
Patroli area akses masuk fasum kondisi terpantau aman
2026-02-10 11:34:21.630279
Patroli area lereng hulu kondisi terpantau aman
2026-02-10 11:34:37.686038
Patroli area puncak tubuh bendung kondisi terpantau aman
2026-02-10 11:34:54.654336
Patroli area lereng hilir kondisi terpantau aman
 
pemantauan
2026-02-10 12:24:01.264634
V-nocth 1 terbaca 0.60 cm , air mengalir jernih dan lancar
2026-02-10 12:24:51.986747
V-nocth 2 terbaca 0.50 cm , air mengalir jernih dan lancar
2026-02-10 12:25:23.220607
V-nocth 3 terbaca 0.47 cm , air mengalir jernih dan lancar
2026-02-10 12:26:02.042793
MONITORING KLIMATOLOGI SELASA 10.02.2026 Cuaca : GERIMIS 1. MAW : 182.84 2. CH : 5 mm 3. CH auto : - mm 4. Anemo : 1205763 5. Penguapan : 2 mm 6. Termo air : - C 7. Penyinaran : 30 menit 8. Radiasi : -W/m²l 9. Suhu max : - C 10.Kelembaban :- % 11. Termo : 29/28 C 12 Piscro. : 24/24 C **kondisi alat KLIMATOLOGI yang tidak terbaca karena sensor telemtri rusak, tidak bisa mengirim data ke server : 1.Curah hujan otomatis 2.Radiasi 3.Suhu max 4.Kelembapan 5.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk 6.Kelembapan 7.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk **KONDISI ALAT KLIMATOLOGI yang berfungsi : 1. Anemometer (baik) 2. Bak penguapan (baik) 3.Penyinaran (baik) 4.Radiasi matahari (baik) 5.Termometer (baik) 6.Piscrometer(baik)
2026-02-10 12:27:35.910866
Jembatan hantar rumah intake, meliputi struktur lapisan beton plat , besi pipa railing hulu hilir dan cat pelapis kondisi baik
2026-02-10 12:28:08.016179
Jembatan hantar rumah intake, struktur lapisan beton abutmen kondisi baik, tidak ada indikasi retakan maupun penurunan
2026-02-10 12:29:27.885572
Jembatan hantar rumah intake, struktur lapisan beton Gelagar sisi hilir kondisi baik, pipa besi drainase berfungsi normal saat hujan
2026-02-10 12:30:27.443097
Jembatan hantar rumah intake, struktur lapisan beton Gelagar sisi hulu kondisi baik, tidak ada indikasi retakan maupun penurunan, pipa besi drainase berfungsi normal saat hujan
2026-02-10 12:31:24.763216
Pengukuran patok geser hilir ( dibantu semua petugas )

Bd Pondok


 
pemantauan
2026-02-10 08:53:07.564625
Pemeriksaan TMA
2026-02-10 08:53:36.478296
Pemeriksaan pos hidrologi kondisi baik curah hujan 0.0

Bd Tukul


 
pemantauan
2026-02-10 08:55:10.205541
Monitoring curah hujan data : 8.7 mm
2026-02-10 08:55:49.898569
Monitoring TMA pagi-siang-sore
2026-02-10 08:56:23.275009
Monitoring 37 VW Pizometer kondisi baik namun FP 3 dan FP 6, EP 4 dan EP 14 anomali pembacaan, monitoring 9 VW Pressure Cell kondisi baik namun anomali pembacaan pada sensor pembacaan EP 6
2026-02-10 09:34:48.603466
Monitoring v-notch horizontal drain, Debit kanan : 2.531 iter/det Debit kiri : 1.820 liter/det
2026-02-10 10:00:01.210377
Monitoring v-notch sesar Debit : 2.614 liter/det
 
operasi
2026-02-10 09:12:07.594366
Membantu petugas pemeliharaan pengecatan ulang lapis dua pagar Spil way.
2026-02-10 14:46:56.115753
Pengecekan rutin sleding gate selama posisi di docing atau tidak beroperasi. di
2026-02-10 14:48:06.047972
Pengeceakan dan pembersihan seluruh kondisi peralatan hme kubikel pln panel kontrol bangunan pelengkap hois dram sleding gate stop klok tesrek dan vasilitas lainnya di dalam rumah intake.
 
keamanan
2026-02-10 12:13:14.209763
Lokasi puncak bendungan kondisi visual terpantau aman cuaca mendung
2026-02-10 15:16:29.228861
Membantu petugas pemeliharaan ngecat padar spilway

Bd Prijetan


 
keamanan
2026-02-10 10:10:58.469601
Pengamanan kawasan dibangunan spillway kondisi terpantau aman cuaca mendung
2026-02-10 10:11:15.317598
Pengamanan kawasan dibangunan intake kondisi terpantau aman cuaca mendung
2026-02-10 16:18:22.214778
Bd prijetan kondisi terpantau aman cuaca cerah berawan
 
operasi
2026-02-10 11:34:45.601645
Pembacaan tma:48.59 mdpl volume:8.561.393m³.

Bd Delingan


 
operasi
2026-02-10 10:14:06.585497
Pengukuran Tma: 204.51 mdpl Volume: 3021700 m3 Curah hujan: 24 mm Cuaca: Cerah Visual: kondisi menara dan pintu intake kondusif aman
 
pemantauan
2026-02-10 10:14:43.488445
Pembacaan vnotch kanan H: 6.0 cm Q: 1.25 l/dt Kiri H: 5.0 cm Q: 0.79 l/dt kualitas air jernih. Petugas: Agung w dan Pujianto
2026-02-10 10:15:52.126637
inspeksi visual pada lereng hilir sebelah utara bendungan Pg 5. kondisi lereng yang berjenis gembalan rumput tanah homogen tidak ada perubahan penurunan yang signifikan, instrumentasi baik, dan patok geser juga baik cuaca cerah

Bd Gonggang


 
pemantauan
2026-02-10 10:22:20.428345
Lereng hulu susunan batu rip rap kurang rapi, sebagian ada penurunan
2026-02-10 10:22:51.922963
Vnotch 2,2 cm debit 0,11 liter/detik
2026-02-10 10:23:27.363522
Lereng hilir tonjolan sebelah kanan dan kiri, rembesan 0 kondisi tanah sekitar masih basah, perlu dibuatkan jalan inspeksi

Bd Ketro


 
pemantauan
2026-02-10 11:09:20.398318
Pemantauan visual pada bangunan pelimpah
 
keamanan
2026-02-10 11:10:58.382566
Patroli siang pada puncak bendung

Bd Kedung Bendo


 
operasi
2026-02-10 11:22:11.415256
Cek tinggi permukaan air.

Bd Notopuro


 
pemantauan
2026-02-10 11:50:11.975065
Lereng hilir utara intake kondisi baik
 
keamanan
2026-02-10 16:51:47.287738
Patroli pagi disekitaran intake dan sempadan cuaca mendung kondisi aman

Bd Mulur


 
koordinator
2026-02-10 11:56:03.301458
absen pagi
 
keamanan
2026-02-10 11:56:35.645797
patroli keamanan tubuh bendungan kondisi aman
 
pemantauan
2026-02-10 11:57:07.650309
pengecekan fisik area drainase kondisi baik
2026-02-10 12:00:49.156961
pengecekan fisik area lereng hulu dan rip rap kondisi baik
2026-02-10 12:01:51.972726
pengukuran curah hujan ch :17.0

Bd Jombor


 
pemantauan
2026-02-10 12:03:14.773296
pemantauan visual pada stasiun curah hujan kondisi baik
2026-02-10 12:03:24.333871
pemantauan visual pada lereng hulu kondisi baik
2026-02-10 12:03:36.670836
pemantauan visual pada puncak bendungan kondisi baik, perlu adanya lapisan perkerasan dan lampu penerangan
2026-02-10 12:03:46.086480
pemantauan visual pada bangunan intake kondisi baik

Bd Kedunguling


 
pemantauan
2026-02-10 12:21:57.547764
Penantauan secara visual pada lereng hulu tubuh bendungan. Kondisi baik / aman
2026-02-10 12:23:48.836977
Pemantauan secara visual pada intake1. Kondisi baik / aman.
2026-02-10 12:26:18.855431
Pemantauan secara visual pada lereng hulu tubuh bendungan. Kondisi baik / aman.
2026-02-10 12:33:24.154835
Pemantauan secara visual pada puncak bendungan. Retakan aspal pengeras bertambah dimensinya.
2026-02-10 12:34:15.200377
Pemantauan secara visual pada puncak bendungan.
2026-02-10 12:35:00.021207
Penginputan dan rekap data hasil kegiatan pemantauan.
 
operasi
2026-02-10 16:27:20.581121
Pengukuran TMA Pagi TMA 165.68 Volume 313793.0
2026-02-10 16:28:55.731319
Pengukuran TMA Siang TMA 165.66 Volume 311350.0
2026-02-10 16:29:13.187516
Monitoring saluran outflow.
2026-02-10 16:29:27.935061
Pengecekan curah hujan.
2026-02-10 16:29:41.557476
Input data TMA.
2026-02-10 16:30:41.078875
Pengukuran TMA Sore TMA 165.65 Volume 310128.0

Bd Kembangan


 
operasi
2026-02-10 12:55:16.873739
Cek tma pagi siang sore dan membantu pemeliharaan
 
koordinator
2026-02-10 17:40:26.049577
Absen piket sore
 
keamanan
2026-02-10 17:43:53.447980
Pantuan patroli piket sore kondisi bendungan aman cuaca mendung

Bd Bendo


 
koordinator
2026-02-10 13:19:14.580792
Pengecekan dan pengukuran Inclinometer serta CEK OW
 
keamanan
2026-02-10 13:19:29.938916
Pengepalan area kantor dan pembersihan sampah
 
pemantauan
2026-02-10 13:19:56.129950
Potong rumput dan pengecekan OW
 
operasi
2026-02-10 13:20:12.701608
Potong rumput area taman kantor UPB

Bd Cengklik


 
pemantauan
2026-02-10 13:26:45.812622
cek v notc
2026-02-10 13:27:34.574639
cek saluran

Bd Saradan


 
koordinator
2026-02-10 15:33:17.456606
Kegiatan briving dan apel pagi bendungan Saradan
2026-02-10 15:34:26.772755
Kegiatan membantu kegiatan pemeliharaan potong rumput di lereng hilir
 
pemantauan
2026-02-10 18:18:10.346422
Pemantauan visual dan pemantauan rumah jaga kondisi baik

Bd Dawuhan


 
keamanan
2026-02-10 16:41:22.275451
Bendungan Dawuhan Aman
 
pemantauan
2026-02-10 17:09:26.578992
pemantauan visual dan instrumentasi bendungan cuaca mendung kondisi visual bendungan terpantau aman
2026-02-10 17:12:20.066129
membantu kegiatan pemeliharaan tiang dan lampu listrik