Kegiatan Petugas Bendungan 2026-02-14
23
Bd Gembong
pemantauan
2026-02-14 05:28:42.104636
Pengukuran curah hujan 4,2 mm
keamanan
2026-02-14 05:29:05.016655
Patroli pagi kondisi aman cuaca berawan
operasi
2026-02-14 05:29:42.848458
Pembacaan Tma pagi : 119,76 m volume : 16.180 m³
koordinator
2026-02-14 05:32:15.862364
Absen dan Pantauan akhir piket malam
2026-02-14 13:04:16.332951
Absen pagi
2026-02-14 13:30:43.878623
Absen siang
Bd Gondang
operasi
2026-02-14 05:41:32.189268
Cek TMA pagi elevasi saat ini 38,17mdpl volume 20.459.659m³
pemantauan
2026-02-14 06:58:06.584572
pemantauan rembesan di saluran vnoth
Bd Sangiran
operasi
2026-02-14 05:47:38.204046
Cek tma elv :127.72 mdpl Vol :10419833 m³ Dbit inflow :0.238 m³/dt Dbit spillway :0.188 m³/dt
Bd Kembangan
operasi
2026-02-14 05:49:41.189038
Turun piket
Bd Krisak
keamanan
2026-02-14 06:08:08.701608
Kondisi puncak bendungan aman
2026-02-14 06:08:26.814078
Kondisi lereng hulu aman
2026-02-14 06:08:48.795192
Kondisi lereng hilir aman
operasi
2026-02-14 06:11:11.968043
Tma pagi elevasi 113.37m volume 2.281.103m3
2026-02-14 06:11:41.114239
Ukur curah hujan 0.0 mm
2026-02-14 06:11:56.317993
Pengisian data log book
2026-02-14 06:12:10.461405
Pengisian data web
pemantauan
2026-02-14 07:38:23.550694
Pemantauan vnotch h=13cm q=8.45lt/dt
2026-02-14 09:53:19.407048
Pemantauan bangunan pelengkap (menara intake) kondisi baik
2026-02-14 09:54:01.982280
Pemantauan puncak bendungan saluran drainase puncak bendungan kondisi baik
Bd Tukul
keamanan
2026-02-14 06:15:41.336565
Patroli pagi dan mematikan lampu . puncak bendungan kondisi visual aman cuaca mendung
operasi
2026-02-14 06:17:59.346482
Patroli pagi piket malam
pemantauan
2026-02-14 08:36:44.330827
Monitoring TMA pagi-siang-sore
2026-02-14 14:09:26.427742
Monitoring 37 VW Pizometer kondisi baik namun FP 3 dan FP 6, EP 4 dan EP 14 bacaan anomali, monitoring 9 VW Pressure Cell kondisi baik namun pembacaan anomali pada bacaan sensor EP 6
Bd Brambang
operasi
2026-02-14 06:25:05.856161
cek tma pagi dan pantauan pagi
keamanan
2026-02-14 07:45:08.197506
Patroli pagi kawasan bd aman cuaca berawan
2026-02-14 14:22:09.886063
Patroli siang kawasan Utara dan sekitar aman cuaca berawan
Bd Gondang2
keamanan
2026-02-14 06:26:41.894634
Pantauan pagi cuaca berawan
2026-02-14 06:42:26.098852
Absen turun piket
operasi
2026-02-14 06:27:12.271397
Cek TMA pagi El 515.05
2026-02-14 11:34:19.913585
Cek tma siang elv 515.05
pemantauan
2026-02-14 06:37:02.973636
Monitoring klimatologi
2026-02-14 13:20:05.651432
Monitoring debit vnotch
koordinator
2026-02-14 11:34:42.597303
Absen pagi 2 petugas jaga malam afif dan ricky
2026-02-14 13:17:37.420414
Absen siang 2 petugas jaga malam afif dan ricky
Bd Gongseng
keamanan
2026-02-14 06:31:49.208405
Patroli pagi aman, cuaca cerah berawan.
2026-02-14 11:39:51.620339
Patroli siang kondusif, cuaca cerah berawan.
operasi
2026-02-14 06:57:30.993925
Bd Gongseng Tma 93.19 MDPL volume 22,914,205.33 m³ cuaca cerah
Bd Kedunguling
pemantauan
2026-02-14 06:48:25.601977
Pemantauan secara visual pada kaki bendung. Penurunan pasangan batu riprap masih tetap
2026-02-14 06:50:07.363125
Pemantauan secara visual pada greenbelt
2026-02-14 06:51:31.538409
Penginputan dan rekap data hasil kegiatan pemantauan
2026-02-14 06:52:27.833246
Pemantauan secara visual pada puncak bendungan.
operasi
2026-02-14 13:30:16.507877
Pengukuran TMA Siang TMA 165.61 Volume 305242.0
2026-02-14 13:30:35.280783
Uji operasi dan pelumasan pintu spillway.
2026-02-14 13:30:54.461141
Monitoring saluran inflow.
2026-02-14 13:31:16.084127
Uji operasi dan pelumasan pintu intake 1.
2026-02-14 13:31:35.435048
Monitoring saluran outflow.
2026-02-14 13:31:54.559953
Uji operasi dan pelumasan pintu flushing/penguras.
2026-02-14 13:32:15.104339
Pengecekan curah hujan.
2026-02-14 13:32:31.699577
Input data TMA.
2026-02-14 13:33:08.780272
Pengukuran TMA Pagi TMA 165.61 Volume 305242.0
Bd Parangjoho
operasi
2026-02-14 06:56:47.281169
Mengecek bukaan pintu intake
2026-02-14 06:56:50.978574
Mencatat debit outflow/inflow
2026-02-14 06:57:18.278139
Pembacaan peilschall TMA pagi 196.01 mdpl volume = 773.288 m³
2026-02-14 06:57:47.279230
Mengukur curah hujan= 1 mm
2026-02-14 11:38:36.152481
Pembacaan peilschall TMA siang 196.01 mdpl volume = 773.288 m³
pemantauan
2026-02-14 07:00:55.278593
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 6.1 cm = 1.30 lt/dt, v-notch no 3= 2.3 cm = 0.12 lt/dt, total debit = 1.73 lt/dt
2026-02-14 11:39:22.541611
Pemantauan visual pemecah arus kolam olak kondisi baik
koordinator
2026-02-14 07:22:52.791806
Absen pagi
keamanan
2026-02-14 12:56:49.693935
Patroli area sepadan aman
2026-02-14 12:57:20.061253
Patroli area intake aman
2026-02-14 12:57:55.293052
Patroli area kom waduk aman
2026-02-14 12:58:29.837936
Patroli area lereng hulu aman
2026-02-14 12:58:59.237075
Patroli area puncak bendung aman
2026-02-14 12:59:33.026427
Patroli area spillway aman
2026-02-14 13:00:08.220346
Patroli area kolam olak aman
Bd Blimbing
keamanan
2026-02-14 06:58:50.608718
Patroli keamanan pagi kondisi aman
pemantauan
2026-02-14 06:59:17.441807
Pemantauan visual pagi cuaca mendung
operasi
2026-02-14 07:27:18.372294
Monitoring tma pagi elevasi 189.39 m volume 21747 m³
2026-02-14 11:10:04.526295
Monitoring tma siang elevasi 189.39 m volume 21747 m³
koordinator
2026-02-14 07:35:47.017373
Absen pagi
Bd Nawangan
operasi
2026-02-14 07:06:48.402193
Tma siang elevasi:226,80mdpl vol:509651m3
2026-02-14 12:17:07.475466
Tma siang elevasi:226,80mdpl vol:509651m3
pemantauan
2026-02-14 07:31:36.051881
Pemantauan v-nocth 1 debit 0.92 ltr/detik
2026-02-14 07:32:19.125098
Pemantauan v-nocth 2 debit 0.09 ltr/detik
Bd Songputri
keamanan
2026-02-14 07:08:13.177036
Patroli pagi sekitar pangakal bendungan lereng hilir kondisi aman cuaca berawan
2026-02-14 11:23:19.196388
Patroli siang sekitar lereng hulu kondisi aman cuaca berawan
operasi
2026-02-14 07:26:04.532920
Pembacaan TMA pagi elevasi 223.87 volume 416401 m³
2026-02-14 11:19:28.100135
Pembacaan TMA siang elevasi 223.87 volume 416401 m³
koordinator
2026-02-14 07:45:11.879912
Absen pagi
pemantauan
2026-02-14 07:45:26.791814
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 9.8 cm (4.19 l/d)
Bd Lalung
operasi
2026-02-14 07:23:36.388980
Cek tma pagi elevasi 150.28 m volume 3374474m3
2026-02-14 13:41:33.671509
Cek tma siang elevasi 150.28m volume 3374474m3
keamanan
2026-02-14 10:26:13.997467
Patroli pagi.kondisi aman,cuaca berawan(petugas:nur rokhim)
Bd Kedung Brubus
operasi
2026-02-14 07:23:50.798018
Tma 108.57 m volume 572722.0m3
Bd Pidekso
operasi
2026-02-14 07:39:09.496301
Elevasi tma pagi:182.99 Volume: 21156610
2026-02-14 07:39:36.051840
Q_outflow bottom outlet:0.905 m³/detik
2026-02-14 12:37:10.675899
Elevasi tma siang:182.99 volume:21156610
keamanan
2026-02-14 11:59:50.148499
Pengecekan papan papan larangan kondisi terpantau aman
2026-02-14 12:00:10.038860
Patroli area akses masuk fasum kondisi terpantau aman
2026-02-14 12:00:25.886159
Patroli area lereng hulu kondisi terpantau aman
2026-02-14 12:00:39.563550
Patroli area lereng hilir kondisi terpantau aman
2026-02-14 12:00:54.979026
Patroli area puncak tubuh bendung kondisi terpantau aman
Bd Gebyar
operasi
2026-02-14 07:52:53.770209
Pembacaan TMA pagi, Elevasi = 325.20mdpl, Vol = 591297m³
keamanan
2026-02-14 09:17:51.538124
Spilway bd gebyar aman
2026-02-14 09:20:14.978316
Tampungan bd gebyar aman
Bd Ngancar
operasi
2026-02-14 08:04:16.936263
Tma pagi E 247.63 MDPL volume:1.412.106 m3
2026-02-14 11:28:46.916062
Tma siang E 247.63 MDPL volume:1.412.106 m3
koordinator
2026-02-14 08:44:08.123811
Absen pagi
pemantauan
2026-02-14 10:24:36.551923
Pemantauan V-notch H:6 cm Q:1.25 L/detik
2026-02-14 10:25:44.808219
Pemantauan V-notch 2. tidak ada rembesan
2026-02-14 10:26:12.306215
Bangunan spillway (jembatan dalam kondisi normal)
Bd Botok
keamanan
2026-02-14 08:20:38.220305
Patroli pagi kondisi aman
operasi
2026-02-14 08:36:55.778708
Pembacaan TMA pagi Peilschall 4.88 m Elevasi 280.45 Mdpl Volume 164070 m³
2026-02-14 08:37:32.840749
Pembacaan outflow intake 0.25 cm Debit 0.698 m³/detik
2026-02-14 08:48:25.483995
Menghitung debit outflow dan inflow, merekap hasil dilog book neraca air waduk dan meneruskan laporan pada web
Bd Gonggang
pemantauan
2026-02-14 10:11:10.712618
Pintu irigasi rusak, perlu dibuatkan bangunan pembagi antara PDAM dan irigasi
2026-02-14 10:11:30.890657
Bangunan pengeluaran sedimen di kolam, dinding aus
2026-02-14 10:11:56.594307
Vnotch 2,1 cm debit 0,10 liter/detik
Bd Mulur
koordinator
2026-02-14 11:13:20.268422
absen pagi
pemantauan
2026-02-14 11:18:22.420981
pengcekan fisik area puncak bendungan kondisi baik
2026-02-14 11:18:55.634224
pengecekan fisik area tangga menuju intek 1 kondisi baik
2026-02-14 11:19:25.528985
pengukuran curah hujan ch :15.0
keamanan
2026-02-14 11:56:58.403546
Patroli tubuh bendungan rumah intake kondisi aman
2026-02-14 11:58:12.334656
Patroli kawasan bendungan saluran spillway kondisi aman
Bd Prijetan
operasi
2026-02-14 11:28:34.471132
Pembacaan tma:49.02 mdpl volume:9.426.468m³.
pemantauan
2026-02-14 12:07:27.318957
cek tma pagiBd Prijetan tma 49,02 mdpl, Volume 9.426.468 m³