Kegiatan Petugas Bendungan 2026-03-01
15
Bd Pacal
keamanan
2026-03-01 00:14:35.250823
Patroli mlm bd pacal terpantau aman, cuaca mendung
Bd Sangiran
operasi
2026-03-01 05:39:46.474028
Cek tma elv :127.72 mdpl Vol :10419833 m³ Ch :4.5 mm Dbit inflow :0.414 m³/dt Dbit spillway :0.188 m³/dt
Bd Prijetan
keamanan
2026-03-01 05:42:34.476640
Monitoring pembacaan TMA pagi bd Prijetan
Bd Gondang2
keamanan
2026-03-01 05:58:57.753538
Absen turun piket malam
2026-03-01 05:59:29.214774
Pantauan pagi bd gondang cuaca berawan terpantau aman
Bd Tukul
keamanan
2026-03-01 06:07:02.912089
Patroli pagi puncak bendungan aman. Area limpasan aman. Kantor aman. Mematikan lampu. Dokumentasi laporan. Cuaca mendung
pemantauan
2026-03-01 07:30:03.043807
Monitoring TMA pagi-siang-sore
2026-03-01 07:30:37.170126
Monitoring curah hujan data : 17.5 mm
Bd Blimbing
operasi
2026-03-01 06:11:29.822654
Monitoring tma pagi elevasi 189.48 m volume 22711 m³
2026-03-01 06:11:54.063131
Penakaran curah hujan 16 mm
Bd Songputri
keamanan
2026-03-01 06:30:11.351438
Patroli pagi sekitar genagan lereng hulu kondisi aman cuaca berawan
koordinator
2026-03-01 06:31:08.695001
Absen pagi
operasi
2026-03-01 06:44:11.212562
Pembacaan TMA pagi elevasi 224.05 volume 433531 m³
Bd Gondang
operasi
2026-03-01 06:32:26.393042
Cek TMA pagi elevasi saat ini 38,22mdpl volume 20.661.975m³
Bd Nawangan
operasi
2026-03-01 06:33:41.864806
Tma pagi elevasi:229,04mdpl vol:721446m3 limpas 4cm dengan debit 0.256m3/dt
Bd Gongseng
keamanan
2026-03-01 06:36:21.689566
Patroli pagi keadaan kondusif cuaca cerah
Bd Krisak
operasi
2026-03-01 06:39:27.425378
Tma pagi elevasi 113.70m volume 2.432.168m3
2026-03-01 06:39:43.061989
Buka pintu intake
keamanan
2026-03-01 06:45:18.214394
Kondisi puncak bendungan aman
2026-03-01 06:46:12.019566
Lereng hilir kondisi aman
2026-03-01 06:47:12.615979
Pintu intake kondisi aman
pemantauan
2026-03-01 06:54:41.474618
Pemantauan vnotch h=15cm q=12.07lt/dt
Bd Parangjoho
operasi
2026-03-01 06:49:00.777127
Mengukur curah hujan 19.2 mm
2026-03-01 06:49:01.299426
Mengecek bukaan pintu intake
2026-03-01 06:49:26.457246
Pembacaan peilschall TMA pagi 196.12 mdpl volume = 793.850 m³
2026-03-01 06:50:51.581493
Mencatat debit outflow/inflow
pemantauan
2026-03-01 06:50:17.760400
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 7.6 cm = 2.24 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 2.69 lt/dt
Bd Gebyar
operasi
2026-03-01 06:58:43.124429
Pembacaan TMA pagi, Elevasi = 325.20mdpl, Vol = 591297m³
Bd Brambang
operasi
2026-03-01 07:01:49.482885
cek tma pagi dan pantauan pagi
Bd Gembong
koordinator
2026-03-01 07:17:52.958616
Absen piket pagi
keamanan
2026-03-01 07:18:42.129478
Patroli pagi kondisi visual bendungan terpantau aman