Kegiatan Petugas Bendungan 2026-01-12
29
Bd Parangjoho
keamanan
2026-01-11 11:58:11.932630
Patroli area kom waduk aman
2026-01-11 12:01:08.254217
Patroli area spillway aman
operasi
2026-01-12 06:47:09.736006
Mengukur curah hujan 15.8 mm
2026-01-12 06:50:22.116583
Mengecek bukaan pintu intake
2026-01-12 06:51:02.266436
Pembacaan peilschall TMA pagi 196.05 mdpl volume = 780.765 m³
2026-01-12 06:51:47.186956
Mencatat debit outflow/inflow
pemantauan
2026-01-12 06:49:58.819253
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt, v-notch no 2= 6.8 cm = 1.70 lt/dt, v-notch no 3= 2.3 cm = 0.12 lt/dt, total debit = 2.13 lt/dt
2026-01-12 08:32:13.604865
Pemantauan Instrumentasi,Pengukuran pada piezometer menghitung hasil pembacaan dan pelaporan melalui web, groub wa, logbook dan form monitoring tekanan pori
2026-01-12 11:18:43.971126
Pemantauan visual lapisan shortcrett bukit tumpuan kiri mengalami pengikisan
Bd Pacal
keamanan
2026-01-12 00:05:21.315802
Patroli malam sepilway pacal dan taman terpantau aman cuaca mendung
2026-01-12 06:07:15.435782
Patroli pagi sepilway pacal dan taman terpantau aman cuaca mendung
2026-01-12 12:23:21.643236
Patroli area genanggan, rumah intek dan area kantor kondisi terpantau aman, cuaca mendung
operasi
2026-01-12 07:03:58.469035
TMA pagi : 114,11 mdpl. Volume : 18.911.100 m³
2026-01-12 12:04:17.689949
TMA siang 114.11 Mdpl, volume 18.911.100m³
pemantauan
2026-01-12 11:12:47.620810
Pengukuran Piezometer, Ow, Rembesan dan V-notch
2026-01-12 11:13:14.379271
Hasil pembacaan Piezometer,Ow, rembesan dan V-notch
Bd Gongseng
pemantauan
2026-01-12 05:17:46.243078
Pembacaan curah hujan
keamanan
2026-01-12 06:22:08.974329
Patroli pagi keadaan kondusif cuaca mendung
2026-01-12 11:25:32.302364
Patroli siang keadaan aman cuaca mendung
Bd Prijetan
keamanan
2026-01-12 05:34:53.964461
Monitoring pembacaan TMA pagi bd Prijetan
operasi
2026-01-12 06:32:52.290187
Pembacaan tma:47.65 mdpl volume:6.787.180m³.
pemantauan
2026-01-12 08:36:44.356353
Pengamatan rembesan vnotch sebelah barat kondisi pembacaan 0cm dan pengamatan rembesan vnotch sebelah timur kondisi pembacaan 7cm namun pembacaan tidak valid karna air sembesan bukan dari tubuh bendungan kualitas air jernih
2026-01-12 08:37:38.807606
Pengamatan instrumentasi pezometer vibrating vare kondisi pembacaan dari 9 titik semuanya 0
Bd Gondang2
keamanan
2026-01-12 05:39:42.511270
Absen turun piket malam
2026-01-12 05:40:20.366231
Pantauan pagi bd Gondang cuaca berawan terpantau aman
operasi
2026-01-12 07:38:21.298904
Cek tma pagi elv 513.65
2026-01-12 11:18:43.107011
Pemanasan genset kondisi normal
2026-01-12 12:01:52.613706
Cek TMA siang El 513.68
koordinator
2026-01-12 11:19:19.635468
Apel pagi, 2 petugas jaga malam karno dan suparlan
pemantauan
2026-01-12 11:19:21.654106
Monitoring curah hujan 7.8mm
2026-01-12 11:19:48.199323
Monitoring piezometer
2026-01-12 11:20:13.994550
Monitoring osp
2026-01-12 11:20:39.860918
Monitoring ow
2026-01-12 11:21:08.166921
Monitoring debit v-notch
Bd Sangiran
operasi
2026-01-12 05:39:46.072339
Cek tma elv :127.72 mdpl Vol :10419833 m³ Ch :11 mm Dbit inflow :0.238 m³/dt Dbit outflow spillway :0.188 m³/dt
Bd Blimbing
pemantauan
2026-01-12 05:46:57.091519
Pemantauan visual Bd pagi cuaca mendung kondisi aman
2026-01-12 05:48:49.461265
Monitoring curah hujan Akumulasi 19.5 mm
keamanan
2026-01-12 05:49:28.384236
Pantauan pagi keamanan kawasan Bd cuaca mendung kondisi aman
operasi
2026-01-12 06:10:51.599842
Monitoring tma pagi elevasi 189.36 m volume 21425 m³
2026-01-12 11:55:44.431243
Monitoring tma siang elevasi 189.17 m volume 19389 m³
koordinator
2026-01-12 07:39:06.034021
Absen pagi
Bd Lalung
keamanan
2026-01-12 05:48:23.553060
Patroli pagi.cuaca saat ini berawan,kondisi masih aman(petugas:nur rokhim)
operasi
2026-01-12 07:54:30.203692
Cek tma pagi elevasi 150.53m volume 3529686m3
pemantauan
2026-01-12 10:12:22.321990
Pemeriksaan Piezometer ow dan v-notch PLB no 1 panjang pipa : 16.15m Pembacaan : 9.34 m Tekanan pori : 6.81 mh²o Elevasi Piezomatrik : 145.016 m
2026-01-12 10:12:53.737247
Hasil pembacaan Piezometer ow dan v-notch
Bd Gebyar
operasi
2026-01-12 06:15:50.450654
Pembacaan TMA pagi, Elevasi = 324.75mdpl, Vol = 548021m³
koordinator
2026-01-12 09:19:09.364811
Absen pagi sugeng turun piket
keamanan
2026-01-12 10:22:50.005315
Patroli tangga inpeksi bd gebyar kondisi aman
2026-01-12 10:23:20.329693
Suplaisy bd gebyar kondisi aman
Bd Gembong
pemantauan
2026-01-12 06:18:25.856616
Mengukur ch pagi 16.0 mm
2026-01-12 08:17:37.355549
Monitoring saluran sekunder ambrol volume kerusakan tetap
keamanan
2026-01-12 06:19:26.957591
Patrolli pagi kondisi aman
koordinator
2026-01-12 06:19:51.018867
Piket pagi
2026-01-12 08:17:21.047461
Absen pagi, gunawan turun piket
operasi
2026-01-12 06:22:01.264055
Pembacaan TMA pagi 120.34 volume 19775
Bd Gondang
operasi
2026-01-12 06:24:56.583346
Cek TMA pagi elevasi saat ini 38,10mdpl volume 20.176.416m³
koordinator
2026-01-12 07:45:53.227663
Absen dan apel pagi BD gondang
pemantauan
2026-01-12 09:54:44.518278
pembacaan pezometer bendungan Gondang
2026-01-12 09:54:59.522893
hasil pemantauan pezometer bendungan Gondang
Bd Krisak
keamanan
2026-01-12 06:40:26.659109
Kondisi pintu intake aman
2026-01-12 06:41:02.176598
Kondisi bangunan pelengkap aman
2026-01-12 06:41:47.184311
Kondisi bangunan spillway aman
operasi
2026-01-12 06:45:57.083822
Tma pagi elevasi 110.09m volume 991.294m3
2026-01-12 06:49:16.526486
Buka pintu debit 0.308 L/dt
2026-01-12 06:49:46.145838
Pengisian data web
2026-01-12 06:49:59.539934
Pengisian data log book
2026-01-12 11:12:54.412215
Tma siang elevasi 110.10m volume 994.687m3
2026-01-12 11:17:25.265651
Ukur curah hujan 0.0 mm
pemantauan
2026-01-12 07:10:37.307089
Pemantauan vnocth h=5cm q=0.80lt/dt
2026-01-12 09:06:32.244815
Hasil pembacaan piezometer
2026-01-12 09:16:22.691734
Pembacaan piezometer
2026-01-12 09:16:56.924236
Pemantauan puncak bendungan pengamatan kelurusan pagar pengaman puncak bendungan kondisi baik
Bd Songputri
keamanan
2026-01-12 06:41:16.704252
Patroli pagi sekitar puncak bendungan kondisi aman cuaca cerah
koordinator
2026-01-12 07:31:39.945868
Absen pagi
2026-01-12 11:24:19.745880
Absen siang
operasi
2026-01-12 07:43:09.786685
Pembacaan TMA pagi elevasi 224.00 volume 428773 m³
2026-01-12 11:24:04.219657
Pembacaan TMA siang elevasi 224.00 volume 428773 m³
pemantauan
2026-01-12 09:09:50.492821
Pemantauan instrumentasi v-notch air rembesan terpantau jernih debit aliran 11.8 cm (6.64 l/d)
2026-01-12 09:12:06.905199
Pemantauan instrumentasi piezometer pipa tegak, 4 unit kondisi baik terbaca normal, tekanan pori dan pembacaan naik setelah turun hujan dan naiknya muka air waduk, elevasi piezometrik masih di bawah elevasi TMA waduk
2026-01-12 09:36:47.309802
Pemeriksaan visual, drainase puncak bendungan kondisi baik, tetap, beton baik tdk ditemukan retakan tdk ditemukan patahan,
2026-01-12 09:38:29.168476
Pemeriksaan visual, perlu dipasang pagar pengaman di kanan kiri intake sepanjang puncak,area puncak mepet jalan umum
Bd Brambang
operasi
2026-01-12 06:43:34.917367
cek tma pagi dan pantauan pagi
Bd Kedunguling
pemantauan
2026-01-12 07:15:35.912105
Pemeriksaan dan pengukuran instrumentasi OW.
2026-01-12 07:17:09.107855
Pemeriksaan dan pengukuran instrumentasi piezometer pipa tegak. Penurunan box Pz5b masih tetap.
2026-01-12 07:18:15.192514
Pemantauan secara visual pada puncak bendung. Retakan aspal pengeras bertambah dimensinya.
2026-01-12 07:19:41.798647
Pemantauan secara visual pada puncak bendung. Retakan aspal pengeras bertambah dimensinya.
2026-01-12 07:21:05.645073
Penginputan dan rekap data hasil kegiatan pemantauan
keamanan
2026-01-12 11:26:32.024004
patroli keamanan area tubuh bendungan,situasi aman cuaca cerah
2026-01-12 11:32:27.333891
patroli keamanan area Kom waduk,situasi aman cuaca cerah
2026-01-12 12:12:53.761416
patroli keamanan area kolam olak,situasi aman cuaca cerah
2026-01-12 12:13:25.912763
Patroli keamanan area spilway,situasi aman cuaca cerah
2026-01-12 12:14:03.176111
patroli keamanan area sempadan,situasi aman cuaca cerah
2026-01-12 12:14:34.792432
patroli keamanan area kantor jaga situasi aman,cuaca cerah
operasi
2026-01-12 11:53:38.529053
Pengecekan curah hujan.
2026-01-12 11:53:48.201308
Input data TMA.
2026-01-12 11:53:59.971253
Monitoring saluran outflow.
2026-01-12 11:54:28.085075
Pengukuran TMA Pagi TMA 165.57 Volume 300356.0
2026-01-12 11:55:03.361983
Pengukuran TMA Siang TMA 165.60 Volume 304021.0
Bd Nawangan
operasi
2026-01-12 07:19:59.754964
Tma pagi elevasi:223,94mdpl vol:281525m3
2026-01-12 12:06:03.199836
Tma siang elevdsi223,97mdpl vol:183641m3
koordinator
2026-01-12 07:49:04.960065
Breafing rencana kerja
pemantauan
2026-01-12 09:24:45.320259
Pemantauan v-nocth 1 debit 1.52 ltr/detik
2026-01-12 09:25:14.804888
Pemantauan v-nocth 2 debit 0.47 ltr/detik
Bd Kedung Brubus
operasi
2026-01-12 07:38:09.310539
Bd kdungbrubus tma 109.08 m volume 715073.0m3
pemantauan
2026-01-12 09:10:12.285110
Kegiatan rutin setiap hari senin, pengukuran istrumentasi piezometer.
Bd Pidekso
operasi
2026-01-12 07:47:50.888440
Elevasi tma pagi:183.43 Volume:22012824
2026-01-12 07:48:11.520458
Q_outflow bottom outlet:0.913 m³/detik
keamanan
2026-01-12 11:24:08.106045
Patroli area akses masuk fasum kondisi terpantau aman
2026-01-12 11:24:47.778363
Pengecekan papan papan larangan kondisi terpantau aman
2026-01-12 11:25:09.745087
Patroli area lereng hilir kondisi terpantau aman
2026-01-12 11:25:29.489977
Patroli area lereng hulu kondisi terpantau aman
2026-01-12 11:25:45.182527
Patroli area puncak tubuh bendung kondisi terpantau aman
pemantauan
2026-01-12 12:27:30.080876
MONITORING KLIMATOLOGI SENIN 12.01.2026 Cuaca : MENDUNG 1. MAW : 183.42 2. CH : 19 mm 3. CH auto : - mm 4. Anemo : 1182990 5. Penguapan : 2 mm 6. Termo air : - C 7. Penyinaran : 75 menit 8. Radiasi : -W/m²l 9. Suhu max : - C 10.Kelembaban :- % 11. Termo : 30/28 C 12 Piscro. : 25/25 C **kondisi alat KLIMATOLOGI yang tidak terbaca karena sensor telemtri rusak, tidak bisa mengirim data ke server : 1.Curah hujan otomatis 2.Radiasi 3.Suhu max 4.Kelembapan 5.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk 6.Kelembapan 7.Alat termo air rusak (posisi vertikal) dikarenakan pipa sebelah bocor air masuk **KONDISI ALAT KLIMATOLOGI yang berfungsi : 1. Anemometer (baik) 2. Bak penguapan (baik) 3.Penyinaran (baik) 4.Radiasi matahari (baik) 5.Termometer (baik) 6.Piscrometer(baik)
2026-01-12 12:28:14.666862
V-nocth 1 terbaca 0.63 cm , air jernih dan lancar
2026-01-12 12:28:47.090323
V-nocth 2 terbaca 0.45 cm , air jernih dan lancar
2026-01-12 12:29:34.385056
V-nocth 3 terbaca 0.43 cm , air jernih dan lancar
2026-01-12 12:30:08.205417
Kegiatan monitoring pencatatan data sumur rembesan OSP dan OW bendungan Pidekso. *OSP yang terdapat di rip rap hulu puncak bendungan : OSP 1 (kondisi bok baik dan ada air) OSP 4 (kondisi bok baik dan ada air) OSP 7 (kondisi bok baik dan ada air) *OSP yang terdapat di rip rap hilir puncak bendungan: OSP 2 (kondisi box baik dan ada air) OSP 3 (kondisi box baik, tidak ada air) OSP 5 (kondisi box baik dan ada air) OSP 6 (kondisi box baik, tidak ada air) OSP 8 (kondisi box baik, tidak ada air) OSP 9 (kondisi box baik dan ada air) OSP 10 (kondisi box baik , Tidak ada air) OSP 11 (kondisi box baik dan ada air) OSP 12 (kondisi box baik dan ada air) * SUMUR REMBESAN OW posisi di hilir bendungan, dari 11 bok yang ada semua dalam kondisi baik dan ada air.
2026-01-12 12:30:35.873241
Penyalinan data hasil monitoring OSP dan OW
2026-01-12 12:30:52.967737
Data hasil monitoring OSP dan OW
Bd Gonggang
koordinator
2026-01-12 07:56:00.163348
Memantau cuaca pagi mendung, kondisi puncak bendungan, bukit tumpuan, TMA Waduk, lereng hulu hilir, area grendbeld dan waduk ( Inflow waduk ), bangunan pengeluaran, peralatan BDSF dan spilway aman kondusif.
pemantauan
2026-01-12 09:38:44.088844
Pemeriksaan instrumentasi kondisi normal, kalibrasi alat pneumatik, box msd/ow, rumah instrumen dinding retak pintu kropos,
2026-01-12 09:39:07.059102
Vnotch 2,0 cm debit 0,09 liter/detik
2026-01-12 09:39:50.592811
Sebagian alat BDSF rusak
2026-01-12 09:53:33.482910
Bukit tumpuan kanan hulu lampu name clatur mati
Bd Ngancar
operasi
2026-01-12 07:58:37.514447
Tma pagi E 245.90 MDPL volume:973.347 m3
koordinator
2026-01-12 08:22:03.716296
Absen pagi.
pemantauan
2026-01-12 09:24:13.684128
Pemantauan V-notch H: 4 cm Q:0.47 L/detik
2026-01-12 09:26:32.045951
Pengecekan peizometer 10 dalam kondisi normal 3 tidak ada airnya dan 1 tersumbat
2026-01-12 09:27:19.846839
Pemantauan V-notch 2. tidak ada rembesan
Bd Botok
pemantauan
2026-01-12 09:28:08.925728
Pengukuran curah hujan dengan hasil 10 mm
2026-01-12 09:29:34.564836
Pengukuran peizometer, P2A: 7.471 ,tekanan pori : 5.154
2026-01-12 09:29:49.151321
Pengukuran rembesan,v-notch 1 peilskal 0,debit 0
2026-01-12 09:30:23.733455
Pemantauan visual puncak bendungan kondisi kurang lampu penerangan
2026-01-12 09:30:44.988518
Pemantauan visual area outlet,kondisi baik
koordinator
2026-01-12 09:31:37.684996
Absen pagi turun piket malam
2026-01-12 09:32:07.998515
Absen pagi narso turun piket
operasi
2026-01-12 09:46:29.610248
Menghitung debit outflow dan inflow, merekap hasil dilog book neraca air waduk dan meneruskan laporan pada web
2026-01-12 09:46:56.862173
Pembacaan outflow intake 0.17 cm Debit 0.391 m³/detik
2026-01-12 09:48:00.650250
Pembacaan TMA pagi Peilschall 7.44 m Elevasi 283.01 Mdpl Volume 482085 m³
2026-01-12 09:50:32.174749
Pembacaan limpasan spillway 5 cm Debit 0.121 m³/detik
2026-01-12 12:43:37.074196
Pembacaan TMA siang hari
Bd Plumbon
pemantauan
2026-01-12 09:52:18.000722
Pengukuran piezometer. Ada 11 buah kondisi terpakai, dan 2 buah kondisi rusak. Beberapa box piezometer ada yang rusak.
2026-01-12 09:52:53.333151
Pemeriksaan visual v.notch 1. Kondisi kering, plat besi V tidak ada, plesteran lantai dan dinding rusak.
2026-01-12 09:53:48.011647
Pemeriksaan visual jembatan hantar bangunan intake 2. Kondisi plat jembatan baik, terbuat dari beton.
2026-01-12 09:56:42.466208
Pemeriksaan visual jembatan hantar bangunan intake 2. Kondisi hand rail baik.
2026-01-12 09:58:08.340805
Pemeriksaan visual jembatan hantar bangunan intake 2. Kondisi besi gelagar berkarat.
2026-01-12 09:58:59.389227
Pemeriksaan visual jembatan hantar bangunan intake 2. Kondisi abutmen mengalami keretakkan.
operasi
2026-01-12 11:21:23.809276
Pembacaan TMA pagi. El 203,90 mdpl. Vol 313.080 m3
Bd Saradan
pemantauan
2026-01-12 09:59:08.302643
Pemantauan visual dan pembacan piezometer
Bd Mulur
keamanan
2026-01-12 10:11:01.168378
Patroli keamanan kawasan tubuh bendungan saluran spillway
2026-01-12 10:11:43.189439
Patroli keamanan kawasan area greenbelt
pemantauan
2026-01-12 11:11:33.389339
pengecekan fisik area pintu intek 2 kondisi dinding.tralis penutup bangunan.ulur pintu kondisi baik
2026-01-12 11:12:02.115210
pengukuran pezometer
2026-01-12 11:12:49.199888
pengukuran curqh hujan total dari malam CH:20.0
koordinator
2026-01-12 12:43:18.003808
absen pagi
Bd Kedung Bendo
pemantauan
2026-01-12 10:27:20.146541
pemeriksaan ow
Bd Pondok
pemantauan
2026-01-12 10:33:02.854098
Pemeriksaan piezometer
2026-01-12 10:33:21.433768
Hasil pembacaan
Bd Cengklik
pemantauan
2026-01-12 11:15:58.592503
cek ow
2026-01-12 11:16:37.942421
cek pizometer
2026-01-12 11:17:06.908345
cek v notc
Bd Kembangan
pemantauan
2026-01-12 11:35:52.499194
Monitoring debit v-notch
2026-01-12 11:36:24.243957
Pengukuran instrumentasi OW
2026-01-12 11:36:44.475782
Pengukuran intrumentasi peizometer
koordinator
2026-01-12 11:37:09.466197
Absen pagi
Bd Notopuro
operasi
2026-01-12 12:17:54.230270
Cek tma pagi cuaca cerah, tma: 91.67 mdpl volume: 564600 m³