Kegiatan Petugas Bendungan 2026-05-01
20
Bd Kembangan
koordinator
2026-04-25 18:44:12.172315
Absen piket mlm
Bd Pacal
keamanan
2026-04-30 23:52:09.129050
patroli malam Spillway pacal kondisi terpantau aman cuaca mendung
operasi
2026-05-01 08:49:37.666338
TMA pagi : 115,20 mdpl, volume : 23.212.424 m³
Bd Gondang2
keamanan
2026-05-01 05:53:07.894302
Absen turun piket malam
2026-05-01 05:53:39.490003
Pantauan pagi bd gondang cuaca cerah terpantau aman
pemantauan
2026-05-01 06:01:08.816063
Monitoring curah hujan 102.5
operasi
2026-05-01 07:03:12.866264
Cek tma pagi elv 515.20
koordinator
2026-05-01 08:31:38.813690
Absen piket pagi bd gondang
Bd Prijetan
koordinator
2026-05-01 05:56:43.366315
Monitoring Pembacaan TMA Pagi hari Bendungan Prijetan
Bd Sangiran
operasi
2026-05-01 06:13:16.660792
Cek tma elv :127.26 mdpl Vol :9718576 m³ Ch :46.6 mm Dbit inflow :0.932 m³/dt
Bd Blimbing
operasi
2026-05-01 06:17:51.676949
Pembacaan tma pagi elevasi 189.60 m volume 24009 m³
2026-05-01 06:18:21.134039
Pengoperasian pintu intake penurunan volume tampungan
Bd Brambang
operasi
2026-05-01 06:22:26.210615
cek tma pagi
2026-05-01 06:22:53.491251
cek bocoran pintu intake
pemantauan
2026-05-01 06:23:25.170166
pemantauan curah hujan 60.0mm
2026-05-01 06:23:53.599330
pemantauan monitoring air masuk
2026-05-01 06:24:34.931572
pemantauan rembesan lereng hilir barat
2026-05-01 06:25:37.594816
pemantauan pintu hidromekanikal intake kondisi baik
keamanan
2026-05-01 06:26:25.389461
pengamanan kawasan pagi kondisi area intake aman
koordinator
2026-05-01 06:27:00.638293
absen turun piket malam
2026-05-01 06:29:12.790976
absen piket pagi tanggal merah
Bd Tukul
pemantauan
2026-05-01 06:32:17.386877
Data pemantauan curah hujan : 16.6 mm
2026-05-01 06:33:09.089769
Monitoring TMA pagi-siang-sore
2026-05-01 06:34:00.220719
Monitoring v-notch sesar Debit : 2.95 liter/det
2026-05-01 06:35:26.733719
Pemantauan v-notch horizontal, Debit kanan : 2.86 liter/det Debit kiri : 1.96 liter/det
2026-05-01 09:17:55.909353
Monitoring 37 VW Pizometer kondisi baik namun FP 3 dan FP 6, EP 4 dan EP 14 bacaan anomali, monitoring 9 VW Pressure Cell kondisi baik namun pembacaan anomali pada bacaan sensor EP 6
Bd Gondang
operasi
2026-05-01 06:45:18.573761
Cek TMA pagi elevasi saat ini 37,61mdpl volume 18.333.700m³
Bd Parangjoho
pemantauan
2026-05-01 06:50:07.263708
Pengukuran pada v-notch no 1= 3.4 cm= 0.31 lt/dt,v-notch no 2= 6.3 cm = 1.41 lt/dt, notch no 3= 2.4 cm = 0.14 lt/dt, total debit = 1.86 lt/dt
operasi
2026-05-01 06:50:11.157052
Mengukur curah hujan 29 mm
2026-05-01 06:52:53.857975
Pembacaan peilschall TMA pagi 196.05 mdpl volume = 780.765 m³
2026-05-01 06:53:09.863052
Mencatat debit outflow/inflow
Bd Krisak
keamanan
2026-05-01 06:53:17.904594
Kondisi kantor bendungan aman
2026-05-01 06:53:47.855976
Kondisi spilway aman
2026-05-01 06:54:17.322874
Kondisi bangunan pelengkap aman
2026-05-01 06:55:04.680263
Kondisi lereng hilir aman
2026-05-01 06:55:31.284257
Kondisi puncak bendungan aman
2026-05-01 06:55:55.912177
Kondisi kom waduk aman
2026-05-01 06:56:27.640777
Kondisi lereng hulu aman
2026-05-01 06:56:53.107693
Kondisi pintu intake aman
operasi
2026-05-01 06:53:57.948517
Tma pagi elevasi 112.72m volume 1.992.329m3
2026-05-01 06:54:11.098461
Ukur curah hujan 0.0 mm
2026-05-01 06:54:25.240286
Pengisian data web
2026-05-01 06:54:37.229575
Pengisian data log book
pemantauan
2026-05-01 07:02:23.483560
Pemantauan vnotch h=12cm q=6.92lt/dt
2026-05-01 07:02:47.917538
Pemantauan puncak bendungan kondisi lapisan pengeras jalan puncak bendungan baik
2026-05-01 07:03:11.958163
Pemantauan lereng hilir pasangan batu rip rap lereng hilir kondisi baik
Bd Nawangan
operasi
2026-05-01 07:11:11.398455
Tma pagi elevasi:228,61mdpl vol:679607m3
Bd Gembong
koordinator
2026-05-01 07:14:23.892364
Absen Turun Piket
keamanan
2026-05-01 07:15:14.964306
Patroli Pagi Situasi Bendungan Aman Cuaca cerah
pemantauan
2026-05-01 07:16:14.970794
Pengukuran CH 37,4 mm Cuaca Cerah
2026-05-01 07:21:50.498848
Pantauan kondisi com
operasi
2026-05-01 07:38:34.943210
Pembacaan TMA Pagi : 119,66 m Volume : 15,560 m³
Bd Kedung Brubus
operasi
2026-05-01 07:20:51.679293
Pengecekan tma dan ch kegiatan rutin
Bd Gongseng
operasi
2026-05-01 07:21:48.307045
Bd Gongseng TMA 93.22 MDPL volume 22003921.97 m³ cuaca cerah
Bd Pidekso
operasi
2026-05-01 07:34:40.207518
Elevasi tma pagi:185.25 Volume:25675779
2026-05-01 07:35:05.352846
Q_outflow bottom outlet:0.946 m³/detik
Bd Songputri
operasi
2026-05-01 07:35:58.019027
Pembacaan TMA pagi elevasi 223.85 volume 414498 m³
keamanan
2026-05-01 08:17:18.034115
Patroli pagi sekitar pangakal bendungan lereng hilir kondisi aman cuaca cerah
Bd Ngancar
operasi
2026-05-01 07:52:14.499156
Tma pagi E 248.79 MDPL volume:1.736.116 m3
Bd Botok
pemantauan
2026-05-01 08:53:44.293414
Pengukuran curah hujan dengan hasil 91 mm
2026-05-01 08:55:53.295260
Pengukuran rembesan v-notch 1 peil scall 0cm debit 0 m³
2026-05-01 08:56:32.638671
Pemantauan visual puncak bendungan kurang lampu penerangan
operasi
2026-05-01 08:59:00.386141
Pembacaan Tma pagi. Peil scall 4.21, elevasi 279.78 volume 97.883
2026-05-01 09:01:16.005317
Pembacaan outflow intake peil scall 46 cm Debit 1.741 M³/dtk
Bd Lalung
operasi
2026-05-01 09:04:17.383301
cek tma pagi elevasi 151.71 m,volume 4235432m3
keamanan
2026-05-01 09:33:30.279214
Patroli pagi.kondisi sekitar pos aman,cuaca saat ini cerah(petugas:nur rokhim)